Commercial Lease Expense Stop & True-Up
Follow annual building expenses through your confirmed exclusions and base-year expense stop. Apply a fixed tenant share to the charge above the stop and compare it with amounts paid. Enter the reported true-up to see where the statement and the calculated amount differ.
Reconcile a commercial lease expense statement
Compare the charge above your documented expense stop with advances paid for the same year.
Edit lease terms and statement amounts
Use confirmed building-level expenses, exclusions and a stop for the same expense pool.
Calculated true-up
Additional payment due.
- Settlement
- $0.01 due
- Last building expense covered
- $180,000.04
- Eligible building expenses
- $180,000.05
- Building-level stop
- $100,000.00
How the building expense was allocated
- Excluded costs
- $0.00
- Eligible within stop
- $100,000.00
- Eligible above stop
- $80,000.05
The fixed 10.00% tenant share applies to expenses above the stop.
Tenant charge and advance payments
Statement settlement · $0.01 due
Statement settlement matches the calculation.
Inspect the exact building expense boundary
Compare the expenses before exclusions. The other inputs stay fixed for both amounts.
Last expense fully covered
$180,000.04
$0.00 settlement
First expense requiring payment
$180,000.05
$0.01 due
Export the true-up ledger
View CSV text
How to use this calculator
- Enter annual building expenses and the total confirmed exclusions for the same cost pool.
- Enter the agreed building-level stop and fixed tenant share.
- Enter annual advances paid. Optionally enter the statement settlement, using a minus sign for a credit.
- Compare the building expense chart, statement result and exact one-cent boundary. Export the ledger to inspect it alongside the statement.
The Formula
The mathematical logic powering this calculation is:
Eligible expenses = reported building expenses minus the exclusions you confirm. Excess = max(0, eligible expenses minus the building-level stop). Tenant charge = excess × fixed tenant share, rounded once to a cent, with half a cent rounded up. Settlement = tenant charge minus total advances paid. A positive result is due under the entered model. A negative result represents a calculated credit. Compare a separately entered statement settlement by subtracting the calculated settlement from it.
To find the cutoff, hold exclusions, stop, share and advances fixed. A whole-cent building expense remains covered while its rounded tenant charge is at or below advances. The next cent shown is the first amount that produces additional payment. The boundary applies to building expenses before exclusions. Dollar inputs range from $0 to $100 million. The optional statement settlement can also be negative. Money and share accept two decimal places.
Use figures already confirmed for the same full year. Enter a building-level expense stop and the same cost pool on both sides of the comparison. Apply any lease-specific caps, occupancy adjustments, allocation methods, proration or dispute process separately.Worked Example
If you input:
- Expenses: $180,000.05 before exclusions. $0 excluded. $100,000.00 stop.
- Tenant: 10.00% fixed share and $8,000.00 advanced.
- Statement: $0.01 reported due.
Result:
The rounded tenant share is $8,000.01, leaving one cent due. At expenses of $180,000.04, advances exactly cover the rounded charge.
Frequently Asked Questions
What goes in the expense stop field?
Use the confirmed building-level dollar amount applicable to expenses eligible for this allocation. When your lease refers to a base year, use the documented adjusted base-year figure for the same expense pool.
How should I enter amounts the landlord excluded before sending the total?
If your entered building amount already reflects all confirmed exclusions, enter zero exclusions to avoid counting them twice.
Can expenses below the stop create a charge?
Under the modeled rule, no charge is allocated when eligible expenses are at or below the stop. After advances, the worksheet shows any credit implied by those inputs.
Is one cent of expense always one cent due?
The tenant share usually allocates only a fraction of the expense change. Separate cent rounding can cause the charge to stay the same over several expense cents.
Similar Calculators
Commercial Rent Calculator & Lease Cost Planner
Compare commercial real estate rent for two tenant offers. Model rentable versus usable square footage, extra rent, escalations, free months and signing cash.
Net Effective Rent Calculator & Lease Concession Comparison
Compare two leases with rent credits, deposits, fees and early exit costs. See effective rent, cash due at move-in and a month-by-month ledger.
Office Space Calculator & Lease Area Planner
Compare two office layouts by peak desks, usable space, modeled rentable square feet, and monthly quote cost. See what each plan needs to fit your budget.
Equipment Lease vs Cash Purchase Planner
Compare equipment lease return, lease buyout and cash purchase. Track deposits, monthly cash flow, retained value, present-value cost and break-even quoted rent.
