Office Space Calculator & Lease Area Planner
Build two preliminary office space programs from shared attendance and budget assumptions. Add workstations, meeting rooms, focus rooms, support rooms and internal circulation. Use a quoted rentable/usable multiplier and lease rates to compare modeled area and monthly costs, then see what changes when both programs are sized for the same peak desk demand.
Compare two office space programs
See which layout meets peak desk demand, what adds to the usable area, and how the modeled lease cost fits your monthly budget.
Shared attendance and budget
Whole team
% of assigned people
% of people present at peak
USD per month
Enter the share of people present at the same time. If everyone present needs a workstation at peak, enter 100% for desk use.
Desk capacity and monthly cost
Neither plan fits peak desks and budget
Plan A costs $1,950.40 less per month. Peak estimate is 90 desks for 90 people present.
Plan A
$26,132.60 per month
- Planned desks
- 80
- Modeled rentable area
- 8,252.4 ft²
At exactly peak desk demand, modeled cost is $28,645.35 per month with all other entries held steady.
Plan B
$28,083.00 per month
- Planned desks
- 96
- Modeled rentable area
- 9,108 ft²
At exactly peak desk demand, modeled cost is $26,678.85 per month with all other entries held steady.
Edit desk, room and lease assumptions
Plan A assumptions
Where the modeled lease area goes
Planned suite areas plus the building allocation implied by each entered multiplier.
Plan A8,252.4 rentable ft²
Plan B9,108 rentable ft²
0 ft²9,108 ft²
Area and quote ledger
The base rate ceiling holds operating charges fixed and rounds down to the highest whole-cent rate within the budget.
Open program and cost comparison
| Measure | Units | Plan A | Plan B |
|---|---|---|---|
| Workstations | ft² | 4,800 | 5,760 |
| Meeting rooms | ft² | 720 | 720 |
| Focus rooms | ft² | 320 | 320 |
| Support rooms | ft² | 400 | 400 |
| Suite circulation | ft² | 936 | 1,080 |
| Building allocation | ft² | 1,076.4 | 828 |
| Planned usable area | ft² | 7,176 | 8,280 |
| Modeled rentable area | ft² | 8,252.4 | 9,108 |
| Planned desks | desk | 80 | 96 |
| Desk capacity above peak | desk | -10 | 6 |
| Annual base rent | USD/year | $247,572.00 | $264,132.00 |
| Annual operating charges | USD/year | $66,019.20 | $72,864.00 |
| Monthly modeled quote | USD/month | $26,132.60 | $28,083.00 |
| Monthly budget remaining | USD/month | $1,367.40 | -$583.00 |
| Monthly cost with peak desk count | USD/month | $28,645.35 | $26,678.85 |
| Base rate ceiling | USD/RSF/year | $31.98 | $28.23 |
Show selectable CSV
How to use this calculator
- Enter total assigned people, observed or scheduled peak attendance, and the percentage of attendees who simultaneously need desks.
- Enter your budget and each option’s assigned people per desk, workstation area, and room quantities and areas.
- Add internal circulation that is missing from room footprints. Enter the quoted rentable/usable multiplier and both annual rates on the same rentable-area basis.
- Compare the desk and budget outcomes. Check the cost of sizing either option to exactly peak demand and use the ledger or export to review the full program.
The Formula
The mathematical logic powering this calculation is:
Take the assigned people times your peak attendance percentage and round up to whole people. Multiply that by the share of people present who need a desk at the same moment and round up for peak desk demand. Planned desks = assigned people ÷ assigned people per desk, rounded up. Compare this separate sharing policy to peak demand. For example, a sharing ratio of 1.5 plans one desk for every 1.5 assigned people.
Workstation area is planned desks times area per desk. Add room count times area per room for each type. Add your circulation percentage to that subtotal for aisles internal to the suite, when those aisles are excluded from the entered areas. Apply the confirmed rentable/usable multiplier to the resulting planned usable area. For a quote based on the same usable area definition, 10,000 rentable ft² ÷ 8,000 usable ft² gives a factor of 1.25. Use the property's quote terms when the lease uses another measurement basis.
Monthly modeled quote = modeled rentable area × (annual base rate + annual operating charges per rentable ft²) ÷ 12. Compare the cent-rounded total to your monthly budget. The whole-cent base rate ceiling divides twelve months of budget by modeled rentable area and subtracts the operating rate, then rounds down to a cent. When the operating charges alone exceed the budget, there is no nonnegative base rate that fits it. The alternate desk count shows the same room and pricing assumptions with exactly the peak number of desks.
This is preliminary office programming and an illustrative quote. Confirm actual layout dimensions, lease area definitions, code, accessibility, and final terms separately. The planner does not apply the BOMA measurement procedures or federal workspace standards. Rent escalation, concessions, fit-out costs, variable pass-throughs and other lease charges require separate evaluation. The inputs support 1 to 10,000 assigned people, a sharing ratio of 1 to 10, up to 500 rooms of each type, a rentable/usable multiplier of 1 to 3, and nonnegative annual rates and an occupancy budget.Worked Example
If you input:
- Office team: 120 assigned, 75% present at peak, all need desks
- Plan A and B sharing: 1.50 and 1.25 people per desk
- Shared room program: 3 × 240 ft² meeting rooms, 4 × 80 ft² focus rooms, 2 × 200 ft² support rooms
- Space factors: 60 ft² per desk, 15% internal circulation, Plan A 1.15 and Plan B 1.10 rentable/usable
- Annual rates and budget: A $30 + $8 and B $29 + $8 per rentable ft² per year, $27,500 monthly
Result:
Peak demand is 90 desks. Plan A costs $26,132.60/month and is 10 desks short. It programs 7,176 usable ft² and models 8,252.4 rentable ft². Plan B has 6 spare desks, programs 8,280 usable ft², models 9,108 rentable ft², and costs $28,083.00/month. At 90 desks with the same rooms and quote, Plan A would cost $28,645.35/month.
Frequently Asked Questions
Why are peak desk demand and planned desks different?
Peak desk demand uses the number of people present and the share needing a desk at the same time. Planned desks use your sharing ratio for all assigned people. Comparing them shows whether the policy can cover your stated peak.
What should I enter for the rentable/usable multiplier?
Use the property’s quoted rentable square feet divided by the comparable usable or occupant area. Ask which areas and measurement standard the quote uses. A factor of 1 leaves the area unchanged.
Why are the two area add-ons separate?
Suite circulation is space inside the office program that the room and workstation footprints do not already include. The building allocation is the extra area implied by the quoted rentable/usable multiplier, which may account for shared building space.
What do I do if the lease gives me exact rentable square feet?
Use the documented rentable area for your final lease quote. This worksheet estimates how much area two preliminary desk and room programs could require. Use the commercial rent calculator with the final documented lease rates and area.
Can I use the meeting room area to determine how many people may occupy it?
This planner sizes an entered room program by floor area only. Use location-specific egress and accessibility requirements and the actual layout to evaluate allowable occupancy.
What costs does the comparison include?
It includes base rent and operating charges on the modeled rentable area. Enter any documented recurring per-area charges that you want included. Evaluate other costs such as improvement work, escalation and deposits separately.
Similar Calculators
Commercial Rent Calculator & Lease Cost Planner
Compare commercial real estate rent for two tenant offers. Model rentable versus usable square footage, extra rent, escalations, free months and signing cash.
Occupant Load Calculator & 2024 IBC Layout Comparison
Compare 2024 IBC modeled occupant loads for two layouts. Add net or gross floor area by use, count fixed seating, and audit each zone.
FTE Calculator & Staffing Capacity Planner
Calculate full-time equivalents from paid hours, see staffing gaps after shrinkage, and budget employee and contractor costs by team and week.
