Chain-Link Fabric, Rail & Hardware Quote Planner
Measure continuous chain-link runs between terminal faces. Compare unspliced and explicitly split fabric, finite roll layouts, top rails with entered joint loss and quoted fittings. See how shared posts and individual attachment faces affect the bill of materials.
Compare chain-link fabric, rails and quote costs
Compare finite mesh and top-rail stock using measured spans, shared terminals and your own hardware quotes.
Example measurements and prices are illustrative. Enter the spans and fittings in your measured design.
Proposal A
$968.00
- Whole fabric rolls
- 3
- Whole rail sticks
- 7
- Fabric attachment faces
- 6
- Authored fabric splices
- 0
Proposal B
$904.00
- Whole fabric rolls
- 2
- Whole rail sticks
- 4
- Fabric attachment faces
- 6
- Authored fabric splices
- 1
Proposal B is $64.00 lower for the measured runs.
Complete quote for Proposal A. Complete quote for Proposal B. Proposal B is $64.00 lower for the measured runs.
Measured runs and splice locations
Drive · Terminal A to B · 36 ft fabric · 35.5 ft top rail · 3 line posts
One continuous piece.
The splice position uses measured distance along the fabric run.
Splice at 13 ft from terminal A.
The splice position uses measured distance along the fabric run.
Roll allocations
The worksheet uses the fewest whole rolls for the entered cuts. A single cut needs its full length on one roll.
Proposal A mesh
- Usable stock
- 48 in × 50 ft
- Raw cut length
- 89 ft
- Whole rolls
- 3
- Remaining after cuts and gaps
- 61 ft
Roll 1 · 37 ft used
Drive 1 (37 ft)
13 ft remains at the end.
Roll 2 · 29 ft used
Garden 1 (29 ft)
21 ft remains at the end.
Roll 3 · 23 ft used
Return 1 (23 ft)
27 ft remains at the end.
Proposal B mesh
- Usable stock
- 48 in × 50 ft
- Raw cut length
- 89.5 ft
- Whole rolls
- 2
- Remaining after cuts and gaps
- 10 ft
Roll 1 · 43 ft used
Drive 1 (13.75 ft) · Garden 1 (29 ft)
7 ft remains at the end.
Roll 2 · 47 ft used
Drive 2 (23.75 ft) · Return 1 (23 ft)
3 ft remains at the end.
Terminal attachments and rail stock
A shared terminal may carry more attachment faces than its single physical post. Rail coverage separates the served span, overlap and excess.
- Terminal A · 1 fabric face · 1 rail end
- Terminal B · 2 fabric faces · 2 rail ends
- Terminal C · 2 fabric faces · 1 rail end
- Terminal D · 1 fabric face · 0 rail ends
Proposal A top rail
- Bought stock
- 73.5 ft
- Joint loss
- 2.5 ft
- Served span
- 63 ft
- Trimming excess
- 8 ft
- Physical joins
- 5
- Separate sleeves
- 5
- Drive · 4 sticks serve 35.5 ft after 1.5 ft of overlap.
- Garden · 3 sticks serve 27.5 ft after 1 ft of overlap.
Proposal B top rail
- Bought stock
- 84 ft
- Joint loss
- 1 ft
- Served span
- 63 ft
- Trimming excess
- 20 ft
- Physical joins
- 2
- Separate sleeves
- 0
- Drive · 2 sticks serve 35.5 ft after 0.5 ft of overlap.
- Garden · 2 sticks serve 27.5 ft after 0.5 ft of overlap.
Edit measured runs and splices
Reuse a terminal ID for a shared physical post. A splice input of 0 means one continuous piece.
Edit Proposal A stock and prices
Edit Proposal B stock and prices
Show fittings and quote ledger
The hardware counts show kit contents. The price ledger charges each entered kit once.
| Item | Proposal A | Proposal B |
|---|---|---|
| Terminal posts and caps | 4 | 4 |
| Fabric faces and tension bars | 6 | 6 |
| Tension bands | 18 | 18 |
| Rail ends and brace bands | 4 | 4 |
| Band bolts with nuts | 22 | 22 |
| Line posts | 7 | 7 |
| Loop tops | 5 | 5 |
| Plain line caps | 2 | 2 |
| Line post ties | 28 | 28 |
| Top-rail ties | 32 | 32 |
| Item | Proposal A | Proposal B |
|---|---|---|
| Fabric rolls | $225.00 | $160.00 |
| Whole rail sticks | $84.00 | $84.00 |
| Separate rail sleeves | $20.00 | $0.00 |
| Fabric face kits | $72.00 | $78.00 |
| Rail-end kits | $20.00 | $20.00 |
| Terminal caps | $8.00 | $8.00 |
| Line cap and tie kits | $28.00 | $28.00 |
| Top-rail ties | $24.00 | $24.00 |
| Terminal posts | $140.00 | $140.00 |
| Line posts | $140.00 | $140.00 |
| Installation per measured foot | $172.00 | $172.00 |
| Splice labor | $0.00 | $15.00 |
| Other quoted costs | $35.00 | $35.00 |
| Complete quote | $968.00 | $904.00 |
Export results
Download chain-link comparison CSVShow selectable CSV text
How to use this calculator
- Enter the common mesh height and each measured fabric run. Reuse the same terminal ID where two runs share a physical terminal post.
- Add the rail span, planned line posts and authored top-rail tie count. Use zero rail span and zero rail ties if the run has no rail.
- Enter each supplier's usable roll length and measured rail stock. Specify any intentional splice by its distance along the run.
- Enter hardware counts and item, kit and labor prices. Check physical fit before comparing complete quotes.
- Inspect the presized fabric rolls, rail lengths and terminal ledger or download the exact CSV.
The Formula
The mathematical logic powering this calculation is:
Use measured fabric spans between terminal attachment faces and independent top-rail spans. One terminal ID denotes one physical terminal post. Each end of each measured fabric run uses its own attachment face. Repeated terminal labels match case-insensitively. A terminal pair identifies one continuous run. Enter planned line posts and top-rail ties directly.
A continuous piece equals measured fabric span plus twice the terminal allowance. To include an authored splice, enter its distance from the first terminal strictly inside the measured span. The two pieces each add the terminal allowance at their outer end and the splice-side allowance at their inner end. Splice location zero gives one unspliced piece. Stock mesh height must match the separately entered design height. Each raw cut fits individually within roll length. Multiple cuts may share one roll if their lengths plus the entered allowances between cuts fit. An exact subset partition returns the smallest whole roll count for those specified pieces. The purchased length equals raw cut length, between-cut allowance and unused length.
For a rail span R, stock stick length S and lost overlap per joint O, require 0 ≤ O < S. Buy one stick if R is positive and at most S. Otherwise buy 1 + ceiling((R−S)/(S−O)). Internal joins are one fewer than sticks for each rail run. Joined coverage equals gross stick length minus overlap loss. The difference between joined coverage and measured span is trimming excess. Rail offcuts stay with their original run in this policy. Separate sleeves follow the join count when selected. Swaged joins retain the same physical join count and add no sleeves to the bill.
Each terminal uses one cap. Each fabric face needs one tension bar and your entered count of tension bands. Each rail endpoint has one rail end and brace band. The worksheet counts one bolt and nut per band. A line post uses a loop top when its run has top rail, otherwise a plain cap. Total ties are the authored rail ties plus the actual number of line posts multiplied by the entered ties per line post. These counted quantities use your design and component selection.
Quote whole fabric rolls, rail stock, sleeve and hardware lines, posts, installation per measured fabric foot, splice labor and fixed scope. Attachment kits cover their grouped hardware once. Rates round at line level to cents, with half-cents upward. One to eight runs and up to twelve pieces per option are supported. Fabric spans, rail spans and roll/rail stock accept thousandths of a foot up to 1,000 ft. Mesh height accepts thousandths of an inch up to 240 in. Enter prices to cents. Illustrative material dimensions and rates are not project recommendations. Post design, gate assemblies, wind, footings and product selection stay separate.Worked Example
If you input:
- Fabric spans: 36, 28 and 22 ft with 48 in mesh. Four shared terminal posts support six fabric faces.
- Fabric stock: 50 ft rolls, 0.5 ft at each terminal and 0.25 ft between cuts. B includes a join at 13 ft on the first run with 0.25 ft extra on each side.
- Top rail: 35.5 and 27.5 ft measured spans. A uses 10.5 ft sticks with sleeves. B uses 21 ft swaged sticks. Joint loss is 0.5 ft.
- Fabric and rail rates: A $75 per fabric roll and $12 per rail stick. B $80 per roll and $21 per stick. Other rates from the illustrative worksheet.
Result:
A uses three fabric rolls, seven rail sticks and five separately purchased sleeves for $968.00. B uses two rolls with the authored splice, four rail sticks and no separate sleeves for $904.00. Both use four physical terminal posts and six fabric attachment faces.
Frequently Asked Questions
Why can a shared terminal post count as two attachment faces?
The physical post is counted once. Each fabric pull terminates independently, with its own tension bar and entered band quantity. A corner can have one cap, two faces and two rail endpoints.
Why does the roll ledger show an unavailable cut with enough total length?
Each unspliced piece must fit within one physical roll. Use the exact splice location from your measured design if that scope includes a join. Aggregate roll length alone does not establish individual fit.
Does the calculator choose a splice location?
No. Enter the joint location stated in the measured design or use zero to retain one continuous piece. The worksheet minimizes whole rolls for the resulting fixed cuts.
How do rail overlaps change stock counts?
The first stick contributes its full length. Each later stick contributes its length minus the entered loss for the join. Exact served length is permitted at the threshold.
Are separate sleeves always included?
Choose the quoted connection convention. A swaged plan can contain physical joints while requiring zero separately bought sleeves. Enter measured joint loss for the actual selected stock.
Which fittings are included in each quote kit?
A fabric face kit covers one tension bar, its entered tension bands and matching bolts. A rail-end kit covers rail end, brace band and bolt. A line kit covers its cap and selected line post ties. Top-rail ties are a separate line.
Similar Calculators
Fence Calculator
Plan fence panels, shared corner posts and gate openings. Compare layouts with a scaled plan, opening schedule, spare panels and material costs.
Lumber Cut List & Purchase Planner
Optimize a lumber cut list across existing boards and supplier stock lengths. Compare purchase costs, saw kerf, offcuts and board-foot pricing with visual cutting layouts.
Sonotube & Concrete Tube Form Calculator
Calculate concrete bags and cubic yards for round tube forms. Add cylindrical bases, compare single or phased orders and see delivery minimums and fees.
Deck Baluster Spacing Calculator
Plan deck baluster spacing from actual widths and post-to-post spans. Compare even and half ends, tape-rounded marks, clear gaps and cut quantities.
