Carpet Tear-Out & Recovery Quote Planner
Compare the full tear-out invoice and the separate receiving charges. Track carpet, padding and other debris by measured area or entered net weight, match each written destination and receiver, and see how minimum fees or a weight cap affect the price.
Compare carpet tear-out and recovery charges
Separate carpet, padding and other debris. Match the written receiver scope before comparing weight fees and removal prices.
Quote B is $10.10 lower.
Quote A
$1,315.00
Written total
Scope matched
Quote B
$1,304.90
Written total
Scope matched
Material weights and receiver fees
Carpet
Recovery required
Quote A · Per short ton
Accepted · Recovery
Route record matches
No written cap
- Fee extension
- $38.00
- Minimum top-up
- $32.00
- Receiver fee
- $70.00
Quote B · Per short ton
Accepted · Recovery
Route record matches
Within written weight cap
- Fee extension
- $87.40
- Minimum top-up
- $0.00
- Receiver fee
- $87.40
Padding
Recovery required
Quote A · Per short ton
Accepted · Recovery
Route record matches
No written cap
- Fee extension
- $16.63
- Minimum top-up
- $23.37
- Receiver fee
- $40.00
Quote B · Included
Accepted · Recovery
Route record matches
No written cap
- Fee extension
- $0.00
- Minimum top-up
- $0.00
- Receiver fee
- $0.00
Other debris
Use the quoted destination
Quote A · Flat receiver fee
Accepted · Disposal
Route record matches
No written cap
- Fee extension
- $25.00
- Minimum top-up
- $0.00
- Receiver fee
- $25.00
Quote B · Flat receiver fee
Accepted · Disposal
Route record matches
No written cap
- Fee extension
- $35.00
- Minimum top-up
- $0.00
- Receiver fee
- $35.00
Compare receiver minimums and weight limits
Explore a different net weight for one stream. Editing here uses an entered estimate and keeps the saved area or ticket inputs.
Selected 760 lb · $1,217.50 to $1,370.00
Measured tear-out and weight sources
The labor area and stair rows are separate from receiving weights. Enter the source and desired destination for each stream.
Edit material quantities
Written removal and receiving terms
Record exactly what each receiver has accepted. Use 0 for confirmed included fees, ? for unknowns and a blank weight cap when no limit is written.
Edit both recovery quotes
Tear-out and collection price lines
Review labor and haul fees
Quote A
- Floor tear-out
- $950.00
- Stair tear-out
- $80.00
- Collection or haul
- $120.00
- Other fixed charges
- $30.00
Quote B
- Floor tear-out
- $855.00
- Stair tear-out
- $120.00
- Collection or haul
- $175.00
- Other fixed charges
- $32.50
How to use this calculator
- Enter the shared floor area and separately quoted stairs. Choose a recorded or estimated source for each material weight.
- Enter each receiver's current written acceptance, destination, fee basis, receipt minimum if applicable and last priced weight.
- Add the contractor's labor, collection and other fixed charges. Compare only matching work and receiving scopes.
- Review the receiver fee extensions and top-ups. Test an estimated weight and download the quote and material ledger.
The Formula
The mathematical logic powering this calculation is:
Enter the measured floor tear-out area and separately priced stair count for the same removal scope. Receiving weights are tracked independently for carpet, padding and other debris. Choose a scale ticket net weight, an entered estimate or an area estimate for each. The area estimate equals entered material square feet multiplied by the written weight per square foot. Enter the source quantities for the actual material; the calculator does not classify materials.
Each quote records receiver acceptance and destination separately. A recovery requirement is matched when the confirmed destination is recovery. A quoted disposal destination differs when recovery is required. Record acceptance and route only when confirmed by the receiver. An unconfirmed route, weight or receiver remains pending. A known zero weight contributes no receiver fee and needs no destination.
For a per-short-ton charge, divide net pounds by 2,000 and multiply by the written rate. Round to cents with ties upward. Minimum top-up is the larger of zero and the quoted receipt minimum minus that extension. Add the top-up once per material receipt. A flat receiver fee is the confirmed fixed amount. An included receiver fee adds zero. A confirmed weight exactly at a written limit is priced. Keep the stream fee open beyond that weight. Use blank only for an uncapped stream and ? for an unknown term.
The work-order total adds measured floor area × per-square-foot labor, stair count × per-stair rate, written collection and other fixed charges, plus all three receiving fees. Keep receipt minimums and labor separate. The entered arithmetic stays visible when terms differ; ranking requires both complete prices and matched removal and receiver scope.
Set one selected stream to a different estimated weight while keeping the saved scale ticket or area source. The chart shows the selected weight, 25 lb samples and nearby receipt minima and weight limits. These samples are exact at their evaluated weights. The worksheet compares prices under supplied terms and does not prescribe handling, recovery eligibility or disposal rules.
Floor and material areas support 0–10,000 sq ft, stairs 0–500 and weight factors 0–5 lb/sq ft. Entered estimates, scale tickets and price caps support 0–50,000 lb. Weights from area retain four decimal places. Rates accept two decimals up to $10,000 per short ton, per square foot or per stair. Flat fees and minimums support $1,000,000. The example weights, receiver terms and prices are illustrative.Worked Example
If you input:
- Removal scope: 950 sq ft of floor and 8 separately priced stairs.
- Receiving weights: 760 lb of carpet and 332.50 lb of padding from area and written weights. A 75 lb net receipt for other debris.
- Quote A: Weight-based carpet and pad fees with separate receipt minima.
- Quote B: Carpet at $230 per short ton through 1,200 lb, included padding and a flat debris fee.
Result:
A totals $1,315 and B totals $1,304.90. With a 900 lb carpet estimate, A stays at $1,315 and B rises to $1,321. The lower quote changes while the removal area and stairs stay fixed.
Frequently Asked Questions
Should I enter my area estimate or the receiver’s scale ticket?
Use the source you have for each separate material stream. An area estimate uses the written weight factor. A recorded weight uses net pounds from the ticket.
What if a receiver accepts carpet but excludes padding?
Record acceptance separately for the two streams. The priced lines remain visible while the unmatched padding scope prevents a lower-quote ranking.
How is a minimum receiving fee calculated?
For a per-ton receipt, add only the amount required to bring the rounded rate extension up to the written minimum.
Can this tell me how to send the carpet for recovery?
The worksheet uses requirements and terms you received from your collector or receiver. Confirm current acceptance and handling with them.
Similar Calculators
Carpet Installation Cost Calculator & Quote Planner
Compare carpet installation quotes with separate billed carpet, cushion, floor labor, removal and stair costs. See when a repair allowance changes the lower bid.
Dumpster Load & Quote Planner
Estimate dumpster loads from debris volume and density bounds. Compare hard payload, included weight, rental extensions and the cost of extra loads.
Tile Removal, Debris & Substrate Handoff Quote Planner
Estimate removed tile and bedding weight. Compare written demolition quotes, substrate handoff, disposal charges and hauling limits.
