Tile Removal, Debris & Substrate Handoff Quote Planner

Measure the existing layers by zone and mark which bedding or bonded layers are coming out. Compare two written tile removal quotes based on the same substrate handoff and protection scope. Use measured dimensions and material density to estimate debris weight, or use actual scale tickets. See how disposal rate, quoted weight limits and per-trip hauling change the price.

Written tile removal bids

Compare tile removal and substrate handoff

Separate what comes out, what the next trade needs and how each quote handles disposal and trucking.

Quote A is $6.00 lower.

Selected debris weight · 1,425 lb · Layer estimate

Quote A

Entered total

$1,654.00

Scope matched

Quoted trips · 1

Quote B

Entered total

$1,660.00

Scope matched

Measure the existing layers

Use separate, non-overlapping zones where the layer thickness or removal scope changes. Enter ? for a missing layer measurement.

Zone 1
Zone 2
What leaves each zone

Zone 1 · 200 sq ft

Tile
0.3 in · 625 lb
Bedding
0.15 in · 300 lb

Zone 2 · 120 sq ft

Tile
0.4 in · 500 lb
Bedding
Stays in place
Tile removal area
320 sq ft
Bedding removal area
200 sq ft
Solid material volume
11.5 cu ft
Estimated debris mass
1,425 lb

What the next trade needs

Select the tasks requested in the shared handoff. Use the written bids to confirm what each price covers.

Edit both written bids

Use 0 for confirmed zero. Use ? for unknown terms. Leave the last priced disposal weight blank when the bid states no limit.

Quote A terms
Quote B terms

Debris weight and trip scenarios

Add hypothetical pounds to the base to test another trip or a disposal price limit. Keep the same accepted material and handoff scope.

Entered bid total by added debris weight
Plot range $1,654.00 to $1,837.28Selected +0 lb
Tile removal quotes by additional debris weightEach available quote applies at whole added pounds for the same scope. Selected 0 added pounds. Quote A is $6.00 lower.05751,150
Quote AQuote BAdditional debris (lb)
  • 0–81 · Quote A lower
  • 82–1,075 · Quote B lower
  • 1,076–1,150 · Unresolved

Removal, handoff and disposal charges

Show selected quote charges

Quote A

Tile removal
$1,024.00
Bedding removal
$220.00
Handoff prep
$125.00
Work-area protection
$80.00
Facility disposal
$110.00
Hauling
$95.00
Other written charges
$0.00

Quote B

Tile removal
$1,400.00
Bedding removal
$0.00
Handoff prep
$0.00
Work-area protection
$60.00
Facility disposal
$200.00
Hauling
$0.00
Other written charges
$0.00

How to use this calculator

  1. Measure tile area, depth and installed density by zone. Mark which zones also have bedding or bonded material scheduled for removal.
  2. Select whether the bids should include further substrate prep and work-area protection for the same handoff.
  3. Choose estimated layer mass or an actual scale-ticket weight. Enter each bid’s area, labor, facility and hauling terms.
  4. Explore added debris weight, check when a trip or disposal price changes, then download the scope and quote ledger.

The Formula

The mathematical logic powering this calculation is:

Create one to four non-overlapping zones. Enter the tile area, average tile layer thickness and installed density for each zone from measured or documented information. Record whether the contractor will also remove the existing bonded layer or bedding. Add its thickness and density when it will be removed. A layer remaining in place adds no debris. Each removed layer's solid volume in cubic feet equals square feet × depth in inches ÷ 12. Estimated mass equals solid volume × entered installed density. Add the unrounded masses and round the total once to a hundredth of a pound. Solid volume describes in-place material and can differ from the space occupied after removal. Use a scale ticket from the same scope in place of the estimate when available. The scale ticket should contain the net debris weight.

Use the common tile area for per-square-foot tile removal and the subset of area where bedding comes out for bedding charges. Enter the written handoff prep and work-area protection separately when requested. Mark a line included only when its price is carried under another line. Enter 0 for a confirmed zero charge and ? or blank for an unknown term. A required excluded task changes the scope even when the other lines are fully priced. Match the written finish requested by the next trade, such as a handoff after removal versus after separate prep.

Disposal can be included, fixed or billed by weight. For a by-weight contract, multiply the combined debris pounds by the written USD per US short ton rate divided by 2,000, round to cents with half a cent upward, and apply any stated once-per-job disposal minimum to a positive load. Preserve a blank upper limit only when no upper price boundary was stated. Enter a question mark if the limit is unknown. Leave charges beyond the last priced weight unresolved. Hauling can be included separately or billed by trip. Round combined debris weight ÷ written net payload up to whole trips, and charge the entered amount per trip. This arithmetic assumes the same fixed net payload per trip and weight as the only capacity constraint. Use the hauler’s approved load and disposal acceptance conditions.

The selected scenario adds whole pounds to the same estimated or scale-ticket base. It does not change the measured area. Evaluate every whole pound in the selected scenario range. For each quote, sum the charges as entered. Only matched scope and complete prices can be ranked. Example prices and densities are illustrative. Have the project team confirm the actual layers, handoff and accepted debris before relying on an estimate.

Zone areas accept 0.01 to 10,000 sq ft, layer depths 0.01 to 6 in and density through 400 lb/cu ft, with two decimal places. Weight and cap inputs accept up to 20,000,000 lb. Price rates accept up to $10,000 and fixed charges up to $1,000,000. Additional-weight scenarios accept 0 to 10,000 whole pounds with at most 2,000 lb between the lower and upper cases.

Worked Example

If you input:

  • Measured layer scope: 320 sq ft of tile. Remove bedding only in the first 200 sq ft. The measured layers total 11.5 cu ft and 1,425 lb.
  • Quote A: $3.20 per sq ft of tile and $1.10 per sq ft of bedding, $125 prep and $80 protection. Disposal $154 per short ton, $110 minimum. Hauling $95 per 1,600-lb trip.
  • Quote B: $1,400 for removal and prep, $60 protection, $200 disposal through 2,500 lb, with hauling included.

Result:

At 1,425 lb, A totals $1,654 and B totals $1,660. B first becomes lower at 82 added lb. A needs one trip at exactly 1,600 lb and two just above it. At 1,925 lb, A totals $1,787.23 and B totals $1,660. B’s disposal price is unresolved above 2,500 lb.

Frequently Asked Questions

Should I include thinset or mortar bedding in the weight?

Add the bonded material only where the written removal scope includes it. Measure or document the layer separately so weight and bedding removal labor use the right quantities.

Can an actual scale ticket replace measured layer mass?

Select Scale ticket and enter the net weight for the same group of removed materials. The measured layer estimates remain visible so you can audit their assumptions.

Is the solid volume the amount of space to book in a bin?

Solid volume is calculated from the measured layers in place. Broken pieces can take up more space, and containers can have separate load restrictions. Use the hauler’s accepted waste and capacity terms.

Why is one quote shown without a comparison?

A cheaper written total can exclude a handoff task, lack a fee or go beyond the last priced debris weight. Confirm the same required work and price with both bidders before ranking.

Can I apply a per-visit facility minimum?

This worksheet applies the disposal minimum once to the total positive load. If your facility prices individual visits, add up the separate written charges and enter the combined fixed disposal price.

Similar Calculators