Carpet Installation Cost Calculator & Quote Planner

Compare two written carpet installation bids for the same work. Use measured floor and removal areas and counts for stairs and transitions. Enter each installer’s billed carpet and cushion quantities, their unit rates and any minimum floor labor charge. Then compare how the totals change as the floor-repair area moves through each quote’s allowance.

Carpet quote worksheet

Compare carpet installation bids

Use the same floor, stairs and transition scope for both bids. Enter written prices and count included work only once.

At 75 sq ft of repairs

Quote B is lower by $34.00

Quote A

$3,436.50

600 sq ft carpet billed · 520 sq ft cushion billed

Quote B

$3,402.50

570 sq ft carpet billed · 530 sq ft cushion billed

Shared installation scope
Quote A
Removal and additional charges

Include any fixed package once. Use zero for lines it already covers.

Quote B
Removal and additional charges

Include any fixed package once. Use zero for lines it already covers.

Quote totals by repair area

Each line ends where its quote stops pricing the work.

Carpet installation quotes over the selected repair rangeAt 75 sq ft of repairs, Quote A is $3,436.50 and Quote B is $3,402.50. The exact quote ranges appear below.

Repair area (sq ft)

Quote AQuote B
Selected repair quote ledger
ChargeQuote AQuote B
Billed carpet$1,380.00$1,197.00
Billed cushion$338.00$318.00
Floor labor before minimum$598.00$702.00
Applied floor labor$650.00$702.00
Removal$240.00$288.00
Disposal$75.00$123.50
Stairs$336.00$408.00
Transitions$60.00$51.00
Other charges$0.00$0.00
Base before repairs$3,079.00$3,087.50
Repair beyond allowance55 sq ft70 sq ft
Added repair charge$357.50$315.00
Selected total$3,436.50$3,402.50
Exact comparison ranges
Repair areaOutcome
0 to 57 sq ftQuote A is lower
58 sq ftSame total
59 to 150 sq ftQuote B is lower

Copyable carpet quote data

How to use this calculator

  1. Enter the same installed floor area, old flooring removal area and stair and transition counts for both quotes.
  2. Copy the carpet and cushion quantities each installer bills and their rates. Use the measured floor area for the labor rate.
  3. Enter labor minimum, removal and any separately charged disposal, stair, transition or fixed costs.
  4. Enter the repair area to compare and how each bid covers it. Use an unpriced allowance if the installer has given no excess rate.
  5. Compare the selected totals, quote coverage, exact price ranges and line-item CSV.

The Formula

The mathematical logic powering this calculation is:

Match the carpet, cushion, removal, stairs, transitions and repair scope across both written bids. The installed floor area, removal area, stair count and transition count are shared. The carpet and cushion quantities billed by each installer can differ. Multiply each billed product quantity by its quoted square-foot rate and round each line to cents, half up. Apply labor to the installed floor area and use the greater of this amount and the entered labor minimum. Calculate removal on the shared area to remove. Add disposal, stairs, transitions and other fixed written charges that are billed separately. Use zero for an item already covered elsewhere in that quote. For a fixed package, enter its total under other quoted charges and zero out the covered lines. Use the final billed quantities from the written quote.
Repairs apply only to the modeled installed floor area. If repairs are already included under the written terms, add zero for the full comparison range. Otherwise subtract the included whole square feet from the repair scenario, with a minimum of zero billable repair. Apply the entered extra repair rate to any excess. With unpriced work past the allowance, the quote has no complete price beyond it. The chart stops that quote where its priced coverage ends. The ranges table checks every whole square foot for lower total, exact tie or missing price. The base ledger stays visible for auditing.
Enter up to 100,000 square feet to two decimals for floor and billed material quantities, 0–1,000 for stairs or transitions, and 0–5,000 whole square feet for repair assumptions. Rates use USD to cents through $10,000 each. Fixed charges use USD to cents through $1,000,000 each. Prices are written quote inputs. The worksheet leaves the condition and repair scope to your installer.

Worked Example

If you input:

  • Shared scope: 520 sq ft installed, 480 sq ft to remove, 12 stairs, 3 transitions. Test 0–150 sq ft of repairs and select 75.
  • Quote A: 600 billed carpet sq ft at $2.30, 520 cushion sq ft at $0.65. Floor labor minimum $650. Base $3,079 after all other lines. Includes 20 sq ft repairs, then $6.50 per sq ft.
  • Quote B: 570 billed carpet sq ft at $2.10, 530 cushion sq ft at $0.60. Floor labor $702. Base $3,087.50 after all other lines. Includes 5 sq ft repairs, then $4.50 per sq ft.

Result:

At 75 repair sq ft, Quote A is $3,436.50 and Quote B is $3,402.50. Quote A is lower through 57 sq ft, they tie at 58, and Quote B is lower from 59 through 150 sq ft.

Frequently Asked Questions

Why is the amount of carpet I’m billed for larger than the floor?

A written quote can include material for roll widths, layout, seams and trimming. Copy the billed quantity as quoted. Use the measured floor area separately for labor.

How do I enter a fixed carpet installation package?

Enter the package as a fixed quoted charge and put zero on the lines it already covers. Add only work outside that package when it has a separate price.

Can removal and disposal have different charges?

Use the installed portion to be removed as the removal rate basis. If the bid has a separate fixed hauling or disposal charge, enter it once.

What does an unpriced repair allowance do?

The quote has a complete total through the entered allowance. Beyond it, the price stays unavailable until excess work is priced, and the comparison identifies any quote that still has a complete total.

How is a labor minimum applied?

The labor minimum replaces floor labor when the installed area times the rate comes to less. Other scope charges are separate.

What counts as a stair or transition charge?

Match the installer’s per-unit scope for both bids. Enter a separate line only when it covers an additional charge outside another entered amount.

Similar Calculators