Assembly Line Station Balance Calculator
Compare two paced line cycle times using measured tasks and their precedence constraints. The calculator finds a minimum-station assignment for each option and the shortest whole-second cycle for a given station budget. Compare time inside each station, idle capacity and the gap between an aggregate lower bound and a feasible assignment.
Balance tasks across assembly stations
Find the fewest stations at two cycle times and the fastest cycle within the entered budget.
Use task ID | whole seconds | predecessor IDs separated by commas. Use a dash when the task has no predecessor.
Only option A fits the entered station budget.
Compare load at each station
Bars show assigned work on a shared scale of 0 to 60 seconds. Each dark marker is that option’s cycle limit.
Option A · 60 s
Duration lower bound 3 stations
- Station 160 s assigned
A → B · 0 s idle
- Station 260 s assigned
C → D · 0 s idle
- Station 355 s assigned
E → F · 5 s idle
Option B · 59 s
Duration lower bound 3 stations
- Station 135 s assigned
A · 24 s idle
- Station 250 s assigned
B → C · 9 s idle
- Station 355 s assigned
D → E · 4 s idle
- Station 435 s assigned
F · 24 s idle
Review the ordered station assignment
Show task durations and predecessors
- A · 35 s
- No predecessor
- B · 25 s
- After A
- C · 25 s
- After A
- D · 35 s
- After B
- E · 20 s
- After C
- F · 35 s
- After D, E
How to use this calculator
- Enter two allowed cycle times in whole seconds and your station budget.
- Enter one row per task. Use uppercase ID | seconds | predecessor IDs separated by commas. Enter a dash for no predecessor.
- Compare minimum station counts, the aggregate lower bound and the exact fastest cycle for your station budget.
- Inspect station loading and task order, then download the exact assignments as CSV.
The Formula
The mathematical logic powering this calculation is:
Assign each task to exactly one station. A predecessor may stay in the same station in an earlier task position or use a prior station. No station’s assigned seconds may exceed the entered cycle. The aggregate station lower bound is the ceiling of total seconds divided by cycle seconds. A task longer than the cycle makes that option infeasible.
Use a completed-task subset as state. Every possible next nonempty station subset must fit the cycle. Its predecessors must be in the completed subset or the new station. The acyclic task order supplies a feasible sequence inside that station. Take one plus the minimum station count among its possible successor states, with zero for the completed list. Among equal minimum counts, prefer a fuller first station, then the lowest entered task mask, and continue recursively.
For a fixed station budget, station count cannot increase as cycle seconds grow. Binary-search the minimal integer cycle from the larger of the longest task and ceiling(total/budget) through total task time. This ideal single-product worksheet uses fixed task times and identically capable stations. Setup, breaks, station-specific tools, movement and variability require separate treatment.Worked Example
If you input:
- Cycle times: 60 s and 59 s
- Station budget: 3 stations
- Task network: Six tasks with 175 seconds of total work and two branches after A
Result:
A 60-second cycle fits in three stations. At 59 seconds four are needed although the duration-only lower bound is three. The minimum cycle for three stations is 60 seconds.
Frequently Asked Questions
Can a predecessor share a station with its successor?
Yes, if the tasks fit the station’s cycle and the predecessor runs first inside the station.
Why can the duration lower bound miss the required station count?
The lower bound treats all task time as if it could be divided freely. Indivisible tasks and their predecessor constraints can leave capacity that cannot be used.
Can this find the shortest cycle with a fixed number of stations?
Yes. It finds the smallest whole number of seconds that permits an assignment using no more than the entered budget.
Do the assignments account for setup, walking or variation?
Use task durations that already represent the fixed work you want included. Sequence-dependent setups, transport, variable work and different capabilities across stations are outside the arithmetic.
How many tasks can I compare?
The worksheet solves 1 to 10 tasks with fixed whole-second durations. Every entered task must appear exactly once.
Similar Calculators
Production Cycle Time & Batch Capacity Planner
Compare production cycle time, whole-lot shift output and bottleneck timing for two process sequences. See when planned batches finish and how much demand fits.
Two-Stage Job Sequencing Calculator & Johnson’s Rule
Find the fastest order for jobs through two shared stations. Compare finish time, idle gaps and completions by a cutoff on one timeline.
Critical Path Calculator
Plan finish-to-start dependencies, find critical chains and compare a changed activity duration. Explore Gantt timing, waiting lags and shared float.
OEE Calculator
Calculate overall equipment effectiveness across production periods. Inspect availability, performance, first-pass quality and equivalent time losses.