3D Print Queue & Plate Deadline Planner

Compare an entered print queue with a reassignment that finishes the same batch as early as possible on up to three interchangeable printers. Use full-plate slicer estimates, the time each printer next becomes available and occupied turnaround time. See exact deadline headroom and inspect how each plate moves.

Compatible printer queue

Compare 3D print plate queues by deadline

Edit plates, printers and deadline
Printer 1
Printer 2

Turnaround is the additional time the same printer stays occupied after each print.

Plate 1
Plate 2
Plate 3
Plate 4
Plate 5

Reassigning plates meets the entered deadline.

Entered order

160 min

30 min after deadline

Earliest finish

130 min

Exactly at deadline

Elapsed time saved
30 min
Total printer occupancy
250 min across printers

Inspect the same plate on both schedules

Deadline at 130 min after plan start

Entered order

Printer 1
Printer 2
0 min160 min

Plate 1 on printer 1

Starts 0 min · Print ends 30 min

Printer free at 40 min

Earliest finish

Printer 1
Printer 2
0 min160 min

Plate 1 on printer 1

Starts 0 min · Print ends 30 min

Printer free at 40 min

  • Printing
  • Turnaround
  • Before next ready
  • Selected plate
  • Deadline
Review the exact plate queue ledger
Plate assignments by schedule
SchedulePlatePrinterNext ready (min)Start (min)Print end (min)Turnaround (min)Printer free (min)
Entered order1100301040
Entered order2200301040
Entered order31040801090
Entered order42040801090
Entered order5109015010160
Earliest finish1100301040
Earliest finish21040701080
Earliest finish3108012010130
Earliest finish4200401050
Earliest finish5205011010120

How to use this calculator

  1. Enter the deadline in minutes after a common plan start.
  2. Set how many equivalent printers are available and when each next becomes free.
  3. List the plates in the order you would normally release them. Enter full-plate slicer times and extra turnaround for each.
  4. Compare the two finish times and deadline margins. Select a plate to see its assigned printer and time in both schedules.
  5. Review or export the exact queue ledger with print and turnaround boundaries.

The Formula

The mathematical logic powering this calculation is:

Measure every time from the same plan start, in whole minutes. Each plate is available at that start. Enter its full-plate print duration and any additional turnaround occupying the same printer directly after the print. A printer’s next-ready offset describes the earliest time that printer may start a new plate. All listed printers must be interchangeable for the entered plates and durations.

The entered-order schedule assigns each plate in the listed order to the printer with the earliest next free time, using lower printer number for a tie. The assigned start is that printer’s next free time. The print ends after its entered minutes, and the printer becomes free again after the entered turnaround. The batch finishes when all assigned printers have completed their final turnaround. An unused printer does not delay the batch.

The earliest-finish schedule searches the assignments of all whole plates across compatible printers. Within each printer it retains the entered relative order and starts the next plate as soon as that printer is free. For any fixed assignment, the printer completion time is its next-ready offset plus the sum of assigned print and turnaround minutes. Since all plates are ready at the start and share a deadline, changing their relative order on a given printer cannot improve the batch finish. An assignment branch is skipped if its partial completion already meets or exceeds the best complete finish. If the original assignment is optimal it is retained. Otherwise the first optimal assignment in printer-number order is retained.

Each schedule’s deadline margin equals deadline minus final occupied time. Zero meets the deadline. The worksheet accepts one to three printers, two to eight plates, 1–100,000 minutes per print, 0–10,000 per turnaround, 0–100,000 to each printer’s next-ready time, and 0–1,000,000 to the deadline. Durations use exact whole minutes.

The timeline uses one compatible printer group with common duration estimates, and counts turnaround after every plate including the last. Slicer estimates, actual preparation, staff availability, interruptions, failures and dependencies can affect a real schedule. Enter any documented fixed occupancy in the applicable field. The worksheet does not operate printers or assess a setup’s physical suitability.

Worked Example

If you input:

  • Compatible printers: Two printers ready at minute zero
  • Full-plate print times: 30, 30, 40, 40, and 60 minutes
  • Turnaround: 10 minutes per plate
  • Deadline: 130 minutes after plan start

Result:

The entered-order queue finishes at 160 minutes. Reassigning completes all five plates by 130 minutes, exactly at the entered deadline. Both use 250 printer-minutes.

Frequently Asked Questions

What if the printers run each plate at different speeds?

Use a group of printers that share the same slicer time per plate. Different printer speeds or compatibility constraints require a different scheduling model.

Does the deadline include time after the final print?

Yes. The finishing time includes every entered turnaround. The ledger separately shows each print-end time and when the printer becomes free.

Should I enter hands-on labor as turnaround?

Use only time that keeps that printer unavailable. The model can overlap operations on different printers. It does not model a shared operator’s calendar.

Can the planner replace a slicer’s estimate?

It schedules the plate duration you supply. Include slicing output appropriate to your actual configured printer and material.

Why might the earliest plan move a late-listed plate to a different printer?

Long and short plates can leave a different workload on each printer. Redistributing them can reduce the latest finishing time while retaining their original relative order within each printer.