3D Printing Cost & Batch Quote Planner
Price the complete print order, including costs a filament-only estimate misses. Compare up to four printer and material scenarios using full-plate slicer estimates, mass-based material prices, expected failed attempts, electricity, machine-hour allocation and hands-on labor. See the cost breakdown, successful and failed consumption, spare parts, total quote and average quote per delivered part. Enter quantity tiers to expose full-plate boundaries instead of assuming a smooth volume discount. Tables and CSV preserve the same calculation. This is a hypothetical costing and quote planner: it does not slice geometry, verify printer fit, predict demand, calculate taxes or guarantee delivery time.
Price the whole print job. See every plate.
Compare materials, machine time and hands-on work across complete build plates. Keep failure allowances, spare parts and selling fees in the quote.
Standard plate: USD 109.58 expected cost; USD 152.61 minimum order quote.
Edit order, printers and materials
Use slicer estimates for complete plates. This planner costs mass-based materials, expected failed attempts and your labor; it does not slice a model, verify printer fit or promise delivery time. Alternatives each fulfill the same order and are not added together.
Quantities to compare
Choose up to eight distinct order sizes. Your current order quantity is always included. Each point recalculates complete plates; the comparison does not interpolate between sizes.
Whole parts 1–1,000,000. Keep quantities distinct.
Whole parts 1–1,000,000. Keep quantities distinct.
Whole parts 1–1,000,000. Keep quantities distinct.
Whole parts 1–1,000,000. Keep quantities distinct.
Whole parts 1–1,000,000. Keep quantities distinct.
Whole parts 1–1,000,000. Keep quantities distinct.
Printer and material scenarios
1–80 characters. Name a printer, material choice or production assumption.
Whole parts 1–10,000. Every plate is printed in full, including the final plate; extra good parts are spares. This does not check bed fit.
More than zero through 10,000 hours, at most six decimal places. Use a sliced full-plate estimate. This excludes hands-on setup and finishing.
0–1,000,000 watts, at most six decimal places. Use measured or representative average power, not automatically the power supply rating.
0–1,000 currency units/kWh, at most six decimal places. No live tariff is supplied.
0–1,000,000 currency units; at most two decimal places. Enter explicit zero if excluded. Your allocation for equipment and upkeep, excluding electricity and labor to avoid duplication.
0–100,000 minutes, at most six decimal places. Charged for successful and failed attempts, even when a failure uses no print time.
0–100,000 minutes, at most six decimal places. Charged only for requested delivered parts; unused spares are not finished.
0–99%, at most six decimal places. Independent identical attempts; a failed plate delivers no good parts. Expected failures are not a retry limit or delivery guarantee.
0–100% of a successful plate’s duration, at most six decimal places. This changes expected machine and electricity costs, not setup labor.
0–100% of each full-plate material quantity, at most six decimal places. No partial-good salvage is assumed.
Materials per successful full plate
Include support structures, purge and other full-plate material use in grams. Enter each material separately at its price per kilogram. Liquid volumes must first be converted using the actual material density outside this planner.
1–80 characters; identify the material and any supports or purge included.
0–1,000,000 grams, at most six decimal places. This is the full plate, not one part.
0–1,000,000 currency units; at most two decimal places. Enter explicit zero if excluded.
25 delivered parts require 5 successful full plates, producing 30 good parts and 5 spares. Expected additional failed plates: 0.5556. Fractional failures describe an average over repeated orders; actual attempts vary.
Selling fees: USD 4.88. Expected profit after modeled costs and fees: USD 38.15. Realized modeled margin: 25.00%. Taxes and customer demand are not modeled.
Where the expected cost goes
Same order, alternative production assumptions. Every bar shares the scale from zero to USD 110.00. Numbered components correspond to the table below.
Standard plate: USD 109.58
Dense plate: USD 110.00
| Component | Standard plate | Dense plate |
|---|---|---|
| 1. Materials | USD 15.83 | USD 15.76 |
| 2. Electricity | USD 0.63 | USD 0.72 |
| 3. Machine allocation | USD 15.83 | USD 19.91 |
| 4. Setup labor | USD 17.78 | USD 14.12 |
| 5. Finishing labor | USD 30.00 | USD 30.00 |
| 6. Design labor | USD 12.00 | USD 12.00 |
| 7. Packaging | USD 12.50 | USD 12.50 |
| 8. Other fixed costs | USD 5.00 | USD 5.00 |
| Total expected cost | USD 109.58 | USD 110.00 |
How order size changes the price per part
Discrete requested quantities, including your current order. Full-plate boundaries can cause jumps, so points are not joined. All scenarios share the axes.
Vertical scale: USD 0.00 to USD 49.77 per part
| Delivered parts | Successful plates | Spare parts | Expected cost | Order quote | Average quote / part | Expected hours |
|---|---|---|---|---|---|---|
| 1 | 1 | 5 | USD 28.72 | USD 40.30 | USD 40.30 | 4.22 |
| 5 | 1 | 1 | USD 35.52 | USD 49.75 | USD 9.95 | 4.22 |
| 10 | 2 | 2 | USD 54.03 | USD 75.46 | USD 7.55 | 8.44 |
| 25 (current) | 5 | 5 | USD 109.58 | USD 152.61 | USD 6.10 | 21.11 |
| 50 | 9 | 4 | USD 192.14 | USD 267.28 | USD 5.35 | 38.00 |
| 100 | 17 | 2 | USD 357.26 | USD 496.62 | USD 4.97 | 71.78 |
Successful work and expected failed consumption
Solid segments: successful plates. Striped segments: expected failed attempts. Hours and grams use separate shared scales. Setup labor applies to every attempt even if a failed attempt consumes zero print time.
Standard plate
5 successful plates + 0.5556 expected failed plates = 5.5556 expected attempts. 30 good parts produced; 5 unused spares.
Machine hours: 20.0000 successful + 1.1111 expected failed · scale maximum 21.1111
Material grams: 600.0000 successful + 33.3333 expected failed · scale maximum 633.3333
Dense plate
3 successful plates + 0.5294 expected failed plates = 3.5294 expected attempts. 30 good parts produced; 5 unused spares.
Machine hours: 18.0000 successful + 1.9059 expected failed · scale maximum 21.1111
Material grams: 570.0000 successful + 60.3529 expected failed · scale maximum 633.3333
Material and labor detail
| Material | Successful grams | Expected failed grams | Total expected grams | Expected cost |
|---|---|---|---|---|
| PLA including supports | 600.0000 | 33.3333 | 633.3333 | USD 15.83 |
Hands-on time: 0.5000 hours design + 0.7407 hours setup + 1.2500 hours finishing. Expected electricity: 3.1667 kWh. Finishing and packaging apply only to delivered parts.
Keep the complete quote calculation
Download all assumptions, material rows, scenarios, cost components, quantity tiers and chart data. CSV retains exact fractions in currency units, hours, grams and kWh. There is no tax, scheduling, printer-fit or demand calculation.
How to use this calculator
- Open Edit order, printers and materials. Set delivered quantity, currency label, once-per-order design time, labor rate, packaging and other fixed costs.
- Enter a target margin, percentage selling fee and fixed fee. Margin plus percentage fee must be less than 100%. Add distinct quantity tiers for comparison.
- For each scenario, enter full-plate capacity and slicer duration, average power, electricity price, machine-hour allocation, setup time and finishing time. Keep electricity and labor out of the machine allocation to avoid double counting.
- Add each material in grams per successful full plate and price per kilogram, including supports and purge. Set the failure probability and the shares of time and material consumed by a failed attempt.
- Select a scenario to inspect the whole-order quote, spare parts, expected consumption and detailed tables. Switch between quote and cost per part on the quantity chart; download the CSV or show its selectable text.
The Formula
The mathematical logic powering this calculation is:
For delivered quantity N and good parts per successful plate C, successful plates B = ceil(N/C), produced good parts = B × C and spares = B × C − N. Every successful plate is printed in full, including the final plate. Enter full-plate slicer time and material mass including supports and purge. The planner does not check physical bed capacity.
Let f be whole-plate failure probability as a fraction. With independent identical attempts and no retry cap, expected failed plates E = B × f / (1 − f); expected attempts = B + E. A failed plate produces no usable parts. These fractional counts are expectations, not scheduled attempts, guaranteed outcomes or risk percentiles. Partial-good salvage and correlated failures are excluded.
Expected machine hours = full-plate print hours × [B + E × failed-time fraction]. Expected material grams for each row = full-plate grams × [B + E × failed-material fraction]. Each material cost = expected grams × price per kilogram / 1000. Expected energy kWh = machine hours × average watts / 1000; electricity cost = kWh × price per kWh. Machine allocation = machine hours × entered machine cost per hour, excluding electricity and labor.
Setup labor hours = expected attempts × setup minutes per attempt / 60. Finishing labor hours = delivered quantity × finishing minutes per delivered part / 60. Design hours = once-per-order design minutes / 60. All three use the entered hands-on hourly rate. Setup is charged even when failed-time consumption is zero. Finishing and packaging apply only to delivered parts, not unused spares. Packaging = delivered quantity × packaging cost per part. Design and other fixed costs occur once per order.
Total expected cost K sums material, electricity, machine allocation, setup labor, finishing labor, design labor, packaging and other fixed costs. With percentage selling fee a, target margin m and fixed selling fee F, exact total quote = (K + F) / (1 − a − m). Percentages are divided by 100 before this formula, and a + m must be strictly below 1. Margin is a share of quoted revenue, not markup on cost. Round the whole-order quote upward to the next cent. Average quote per delivered part = rounded total quote / N; this average is not an independently rounded unit invoice.
Selling fee = rounded order quote × a + F. Expected profit = rounded quote − selling fee − expected cost. Realized modeled margin = profit / rounded quote × 100, unavailable at zero quoted revenue. Processor fees are continuous model amounts; real fee rounding and tax treatment may differ. Cost components and fractions are exact until display, ordinary displayed values round half away from zero, and a fraction remains visible if rounding would erase a nonzero value. CSV retains exact reduced fractions in currency units, not cents.
Quantity comparisons recalculate each scenario at the sorted distinct entered tiers plus the current quantity. Points are discrete; do not interpolate across full-plate boundaries. Each scenario independently fills the same order. Their costs, hours and revenue are not added together. Machine hours are total expected occupancy, not wall-clock lead time or fleet scheduling.
Limits: 1–4 scenarios; 1–6 materials each; 1–8 distinct quantity tiers. Delivered quantities are whole 1–1000000 and parts per plate whole 1–10000. Print hours are greater than zero through 10000. Material grams and watts allow 0–1000000; price per kilogram and machine hourly cost 0–1000000. Electricity price allows 0–1000 per kWh. Setup and finishing minutes allow 0–100000; design minutes 0–1000000. Labor rate, packaging per part and fixed selling fee allow 0–1000000; other fixed costs 0–1000000000. Money allows two decimal places, except electricity price allows six; other decimal inputs allow six. Failure probability allows 0–99%; failed time/material shares 0–100%; margin and revenue fee each 0–99% with sum below 100%. All inputs use plain unsigned decimal strings. Currency is a label, not conversion. Numerical limits are not printer capability recommendations.
Source context: Prusa describes material, preparation, operating and failed-print costs. Its historical 2020 example prices are not used as current rates or evidence that electricity is always negligible. NIST defines expected failures before a success; the multiple-success expectation here adds that expectation across B successful plates. Rates, power, failure probability and losses are user-authored assumptions.Method sources
Worked Example
If you input:
- Order: 25 delivered parts; USD label; compare quantities 1, 5, 10, 25, 50, 100
- Common costs: 30 design minutes; USD 24/hour labor; USD 0.50 packaging/part; USD 5 other fixed cost
- Quote: 25% target margin; 3% selling fee + USD 0.30/order
- Standard plate: 6 parts; 4 hours; 150 W; USD 0.20/kWh; USD 0.75/machine-hour; 8 setup minutes/attempt; 3 finishing minutes/delivered part
- Standard material and failures: 120 g PLA/plate at USD 25/kg; 10% failure probability; failures consume 50% time and 50% material
- Dense plate alternative: 10 parts; 6 hours; 180 W; USD 0.20/kWh; USD 1/machine-hour; 10 setup minutes; 3 finishing minutes; 190 g PLA at USD 25/kg; 15% failures consuming 60% time/material
Result:
The standard scenario requires 5 successful full plates, producing 30 good parts with 5 spares. Expected failed plates are 5/9 and total expected machine hours are 190/9 (about 21.11). Expected material is 1900/3 grams, costing USD 95/6. Total expected cost is USD 4931/45 (about 109.58). The exact order quote is USD 49445/324; rounding upward gives USD 152.61. Average quoted price per delivered part is USD 15261/2500 (6.1044), displayed as 6.10 but not a separately rounded unit invoice. These are hypothetical expectations before tax, not guaranteed production outcomes.
Frequently Asked Questions
Do I enter filament for one part or the whole plate?
Enter the entire successful plate, including all parts, supports and purge. Every successful plate is modeled as full, even when the last plate creates spares. The planner does not automatically reslice a partly filled plate.
Why can ordering one more part cause a price jump?
An extra part can require another full successful plate. That adds print time, material and setup. The quantity comparison recalculates each order size and uses disconnected points so it does not imply smooth pricing between plate boundaries.
What does a fractional expected failed plate mean?
It is an average across repeated orders under the entered independent, constant failure probability. Actual orders have whole attempts and may vary widely. The planner does not set a retry cap or provide a delivery-confidence guarantee.
How are early and late failures treated?
You enter the fraction of normal print time and material consumed by a failed attempt. Early failures can use less than a whole plate; late failures can use 100%. Every attempt still incurs the full entered setup time, and failed plates produce no usable parts.
Is machine time the same as paid labor or delivery time?
No. Machine time measures expected printer occupancy. Labor includes design once per order, setup for each attempt and finishing for delivered parts. The model does not schedule operators or parallel printers, so machine hours are not a promised lead time.
Is the target margin a markup?
No. Target margin is profit as a share of quoted revenue after modeled costs and selling fees. The quote solves for that margin and rounds the whole order upward to cents. Actual taxes, fee rounding and market acceptance are outside the model.
Can I invoice the displayed average price per part?
The model quotes the entire order. Its per-part average is displayed rounded, so multiplying that displayed value by quantity can differ from the total quote. Use the total or establish a separate unit-price rounding policy; CSV retains the exact average.
Does this support resin volume, STL upload or automatic printer settings?
It accepts material mass in grams and manual full-plate time estimates. It does not infer mass from volume, slice files, validate geometry or supply printer profiles. If starting from liquid volume, convert using the actual material density before entering mass.
Similar Calculators
Electricity Cost Calculator
Estimate appliance electricity cost from wattage, daily use, electricity rate, and billing fees.
Profit Margin Calculator
Calculate gross, operating, and net profit margin percentages for your business or product.
Freelance Rate & Capacity Planner
Calculate the freelance hourly rate needed to fund your income target, overhead and retained surplus. Compare billable utilization, fees, costs and annual income visually.