Wallpaper Installation, Stripping & Prep Quote Planner

Measure your walls once and compare two written wallpaper quotes even when one bills by wall area and the other bills by confirmed roll units. Choose which walls need stripping. Audit rounded removal hours, labor minimums and separate charges. See when unpriced prep interrupts the comparison or when extra prep makes a different quote cheaper.

Written installer bids

Compare wallpaper installation, stripping and prep

See which wall measurements and billing units drive each written quote, then test how additional prep changes the total.

Quote B is $59.68 lower.

Selected scenario · 10 sq ft of additional prep

Quote A

Entered total

$1,148.93

Hang 292.825 sq ft · Strip 176.625 sq ft

Scope matched

Quote B

Entered total

$1,089.25

Hang 7.5 billed roll units · Strip 150 billed min

Scope matched

Walls and shared scope

Enter full wall dimensions and any opening area separately. Mark only the walls that need stripping.

Wall 1
Wall 2
Wall 3
Measured wall and opening areas
Net surfaceOpenings
  • Wall 1 · Strip102.25 sq ft net · 21 sq ft openings
  • Wall 276.95 sq ft net · 18.25 sq ft openings
  • Wall 3 · Strip74.375 sq ft net · 0 sq ft openings
All walls · Gross
292.825 sq ft
All walls · Net
253.575 sq ft
Gross stripping surface
197.625 sq ft
Net stripping surface
176.625 sq ft

Written quote terms

Match the product and requested work across both quotes. Enter 0 for confirmed zero and ? or a blank for an unknown price.

Edit both quotes
Quote A terms
Quote B terms

Additional prep explorer

Test extra work after the initial scope. Enter whole square feet within the measured net surface.

Written total by additional prep area
Plot range $1,026.25 to $1,561.75Selected 10 sq ft
Wallpaper quotes by additional prep areaEach point represents a matched, priced quote at one whole square foot. Selected 10 square feet. Quote B is $59.68 lower.02755
Quote AQuote BAdditional prep (sq ft)
  • 0–16 · Quote B lower
  • 17–55 · Quote A lower

Charges and billing units

Show selected charge ledger

Quote A

Hang new wallpaper
$775.99
292.825 sq ft
Strip old wallpaper
$291.43
176.625 sq ft
Additional prep
$0.00
0 sq ft above allowance
Minimum uplift
$49.01
Separate charges
$32.50

Quote B

Hang new wallpaper
$731.25
7.5 billed roll units
Strip old wallpaper
$250.00
150 billed min
Additional prep
$63.00
6 sq ft above allowance
Minimum uplift
$0.00
Separate charges
$45.00

How to use this calculator

  1. Enter each wall’s width, height and total opening area. Select any walls that require old-paper removal.
  2. Choose whether the common job includes hanging new wallpaper. Enter time for hourly removal when quoted.
  3. Enter both written price bases, included prep, labor minimums and separate charges. Confirm each scope only when it covers equivalent work.
  4. Explore a range of additional prep area. Check the wall measurements, pricing crossover and charge ledger, then download the CSV.

The Formula

The mathematical logic powering this calculation is:

Measure one to six rectangular walls in feet. Per wall, gross area is width × height. Net area is gross less the total opening area you enter for that wall. Use the sums for all entered walls to calculate hanging labor and only the walls selected for stripping to calculate removal labor. A quote that bills gross area charges across the full wall dimensions. An area billed net deducts the entered openings. Handle any estimate-specific partial opening deductions using a written fixed fee rather than assuming this worksheet matches the contractor’s area rule. Where the quote uses roll units, enter the exact billed number from the installer, including any fraction explicitly stated. Use the Wallpaper Calculator to estimate physical rolls, cuts and pattern repeat separately.

Multiply each price by the relevant measurement or enter the written fixed amount. In a time-based removal quote, round the whole minutes upward to the selected billing interval, then divide by 60 and multiply by the hourly rate. Where stripping is included, enter the bundle as the written fixed hanging charge or include the bundle in separate charges for a stripping-only job. A stripping line excluded from a quote stays outside paid scope when stripping is requested. Unpriced lines remain unresolved. Use 0 for confirmed zero amounts and enter ? or leave a price blank for unknown terms.

Set an extra prep scenario using additional square feet within the common measured net surface. In a stripping-only job, that limit uses the selected stripped walls. The billable amount is the scenario minus the included prep area, floored at zero. Price that difference at the stated rate, mark it included, or leave price or scope unresolved above the allowance. This scenario represents additional prep such as quoted patches. Confirm the underlying work and which tasks the written quote treats as prep before comparing.

Round each extended charge to USD cents with half a cent rounded up. A hanging minimum applies to hanging labor; a total-labor minimum applies to hanging, stripping and additional prep together. In either case add only the shortfall above the affected line or subtotal. The separate-charge line is outside the minimum. For known, nonnegative terms, the greater of a written minimum and the sum of its known applicable lines is a lower bound until missing amounts are resolved. If the floor still might depend on a missing charge, the final minimum uplift stays unresolved. Include quoted material, disposal and confirmed taxes where appropriate. For a different minimum rule or an all-inclusive package, compute the contract result separately and enter it as a fixed written amount with the other included lines at zero.

Evaluate every whole square foot within the chosen scenario interval. Rank only amounts with complete prices for both quotes and confirmed equivalent scope. Explicit exclusions override a general scope confirmation for the scenario affected. This worksheet uses illustrative written terms and user inputs; installers determine suitable materials, surface treatment and final pricing.

Wall dimensions accept 0.01 to 200 feet and openings accept 0 to 40,000 sq ft, with up to two decimals. The measurement product retains four decimals. Billed roll units accept up to 10,000 with two decimals. Removal time accepts 0 to 6,000 whole minutes. The prep explorer checks 0 to 300 whole sq ft within the active net surface. Price rates accept up to $10,000 and fixed amounts up to $1,000,000, to cents.

Worked Example

If you input:

  • Measured walls: 292.825 sq ft gross, 253.575 sq ft net; 176.625 sq ft net selected to strip.
  • Quote A: Gross-area hanging at $2.65 with an $825 hanging minimum, net-area stripping at $1.65, first 15 sq ft of prep included, $4.75 per sq ft after, $32.50 separate.
  • Quote B: 7.5 billed rolls at $97.50, 133 removal minutes rounded up to 150 at $100/hr, first 4 sq ft of prep included, $10.50 per sq ft after, $975 labor minimum, $45 separate.

Result:

At 10 sq ft of extra prep, A totals $1,148.93 and B totals $1,089.25, making B $59.68 lower. At 50 sq ft, A totals $1,315.18 and B totals $1,509.25. Within the 0–55 sq ft example, the lower quote switches from B to A at 17 sq ft.

Frequently Asked Questions

Why do the bids use different wall areas?

A gross-area price uses the full rectangle. A net-area price deducts only the opening area entered for each wall. Stripping also uses only the selected walls. Confirm whether the installer deducts openings or includes the area around them in a written fixed price.

Do billed roll units tell me how much wallpaper to buy?

Use the material label and the separate Wallpaper Calculator to work out your physical rolls and cuts. Here, billed roll units are the installer’s labor quantity and may use a different single- or double-roll convention.

Can I compare quotes for wallpaper removal alone?

Turn off hanging and select the walls to strip. Compare area, billed time, covered work and fixed prices across the written removal quotes. Additional prep scenarios then use only the net area of the stripped walls.

When should I use a total-labor minimum?

Use it when the quote applies the minimum to the sum of hanging, stripping and prep. When the minimum only applies to hanging, use Hanging only. Put separate charges outside the minimum unless the written total already includes them.

Why does the comparison stop after some additional prep?

A quote may include a set area for prep and leave later work unpriced or excluded. The last included square foot stays covered. Obtain a written extension before ranking the quotes for a larger scope.

Similar Calculators