Triathlon Pace & Cutoff Calculator

Plan triathlon finish time from course distances, swim and run paces, average bike speed, and both transitions. Compare two strategies at the swim exit, bike finish and race finish. Check each entered cutoff against the timing basis on your race guide.

Two triathlon pace plans

Compare triathlon pace plans

Edit distances, paces and cutoffs
Plan A splits
Plan B splits
Entered cutoffs

Use H:MM:SS. Course-clock cutoffs and the start offset use the same clock reference. Leave unused limits blank.

Only plan A meets the entered cutoffs.

Plan A

05:32:30 elapsed

05:45:00 on course clock

Meets entered cutoffs

Latest modeled start offset

00:12:30

Race finish

Plan B

05:33:18 elapsed

05:45:48 on course clock

Misses an entered cutoff

Latest modeled start offset

00:11:42

Race finish

Inspect a race checkpoint

Course clock with the entered start offset

00:00:0007:00:00
  • Swim
  • T1
  • Bike
  • T2
  • Run
  • Selected checkpoint
  • Athlete-elapsed limit
  • Course-clock limit

Race finish

Plan A

Athlete elapsed · 05:32:30
00:27:30 early
Course clock · 05:45:00
Exactly at cutoff

Plan B

Athlete elapsed · 05:33:18
00:26:42 early
Course clock · 05:45:48
00:00:48 late
Review the exact triathlon timing ledger
Triathlon splits and cutoff margins
Plan and segmentDurationAthlete elapsedCourse clockAthlete-elapsed marginCourse-clock margin
A · Swim00:38:0000:38:0000:50:3000:07:00 early00:03:30 early
A · T100:05:0000:43:0000:55:30——
A · Bike03:00:0003:43:0003:55:3000:17:00 early00:04:30 early
A · T200:04:0003:47:0003:59:30——
A · Run01:45:3005:32:3005:45:0000:27:30 earlyExactly at cutoff
B · Swim00:41:1000:41:1000:53:4000:03:50 early00:00:20 early
B · T100:04:0000:45:1000:57:40——
B · Bike02:55:3703:40:4703:53:1700:19:13 early00:06:43 early
B · T200:03:3003:44:1703:56:47——
B · Run01:49:0105:33:1805:45:4800:26:42 early00:00:48 late

How to use this calculator

  1. Copy the swim, bike and run distances from the course description.
  2. Enter two sets of moving paces and T1 and T2 durations.
  3. Enter athlete-elapsed limits from the individual start. For course-clock limits, use the same reference for the deadlines and planned start offset.
  4. Compare each plan at the swim exit, bike finish and race finish. Inspect the timeline and export the exact seconds.

The Formula

The mathematical logic powering this calculation is:

Each plan uses the same course distances. Swim duration is swim meters multiplied by seconds per 100 m, divided by 100. Bike duration is bike kilometers divided by km/h, multiplied by 3,600. Run duration is run kilometers multiplied by seconds per kilometer. Round each moving leg up to the next whole second if needed, then add the entered whole-second transition times. The bike-finish time includes swim, T1 and bike. The race finish also includes T2 and run.

Athlete elapsed time starts at your start. Course time starts from the same reference moment you use for all course-clock deadlines. For example, if the reference is 06:00 and the start is 06:12:30, enter a start offset of 0:12:30. For an 11:45 course-clock closure enter 5:45:00. The course clock at each checkpoint is its modeled elapsed time plus the common start offset. Leave unused cutoff fields blank. A zero cutoff is a timed limit at the origin.

For each entered cutoff, subtract the corresponding checkpoint time from the limit. A zero or positive difference qualifies. Each entered course-clock cutoff independently allows a latest offset of its limit minus the athlete-elapsed checkpoint time. The minimum is the last offset at which all clock cutoffs are met, including ties. An athlete-elapsed miss persists at every start time. A negative minimum means the plan misses a course-clock cutoff even if it starts at the reference. With no course-clock cutoff, there is no calculated latest start offset.

The three supported checkpoints are swim exit, bike finish and race finish. Enter the distances and timing rules in your event documents. Intermediate course points, individual transition limits, penalties and scheduling restrictions require separate checks. This worksheet models the entered average pace or speed and transitions for scenario planning. Keep planned stops within the relevant modeled split. The sample cutoffs are illustrative.

Swim distance accepts 1–10,000 whole meters. Bike and run accept 0.001–300 km and 0.001–100 km, respectively. Bike speed accepts 1–150 km/h with up to two decimals. Swim pace accepts M:SS from 0:01–30:00, and run pace accepts 0:01–60:00. Use H:MM:SS up to 99:59:59 for offset, transitions and cutoff fields. Chart and CSV use exact modeled whole seconds.

Worked Example

If you input:

  • Course: 1,900 m swim, 90 km bike, 21.1 km run
  • Plan A paces: 2:00 per 100 m, 30 km/h and 5:00 per km. T1 5:00 and T2 4:00.
  • Plan B paces: 2:10 per 100 m, 30.75 km/h and 5:10 per km. T1 4:00 and T2 3:30.
  • Start and closure: 0:12:30 start offset and 5:45:00 finish closure on the same course clock.

Result:

Plan A clears the finish closure exactly at 5:45:00 on the course clock. Plan B reaches it at 5:45:48 and has a last qualifying start offset of 0:11:42.

Frequently Asked Questions

What is the difference between athlete elapsed and course clock?

An athlete-elapsed limit is measured from your start. A course-clock limit is measured from the common reference you entered. The same checkpoint can have both limits.

Does the bike cutoff include transition time?

The bike finish includes the swim, T1 and the bike. The race finish also includes T2 and the run.

What if two checkpoints allow the same latest start?

The worksheet records both as limiting. One additional second misses both course-clock deadlines.

What if a pace-based leg requires a partial second?

Round that leg up to the next whole second before adding it to the cumulative schedule.

Can I use this to confirm official race eligibility?

Check all rules with your organizer. This worksheet only checks the three entered endpoints and modeled split times.

Similar Calculators