Textured Ceiling Surface & Quote Planner

Measure flat, sloped and symmetric vaulted ceiling surfaces. Compare two entered contractor quotes by room, with separate area rates for reported findings and written professional scope. See which areas are priced, which are outside each quote and which still await scope.

Measured surface and written scope

Compare textured ceiling measurements and quotes

Example dimensions, assessment records and prices are illustrative. Use the findings in your professional report and the prices in your written quotes.

Proposal A

$2,150.00

Complete entered quote

Area included in quote
500 ft²
Area awaiting scope
0 ft²

Proposal B

$2,630.00

Complete entered quote

Area included in quote
500 ft²
Area awaiting scope
0 ft²

Proposal A is $480.00 lower for the entered scope.

Different work choices in Living room, Hall, Studio.

Proposal A complete quote $2,150.00. Proposal B complete quote $2,630.00. Proposal A is $480.00 lower for the entered scope.

Measured ceiling cross-section

Studio · Symmetric vault
Symmetric vault section with 16 ft horizontal width and 6 ft rise on the same scale.
Horizontal width
16 ft
Rise
6 ft
True width along ceiling
20 ft
Room length
10 ft
Projected room area
160 ft²
Gross ceiling surface
200 ft²
Entered cutouts
20 ft²
Net ceiling surface
180 ft²

Professional report records presence

  • Proposal A · Cover and finish · Included in priced area
  • Proposal B · Remove and finish · Included in priced area

Areas included or held

500 ft² net measured ceiling · 480 ft² projected room area

Proposal A

Area included in quote
500 ft²
Area awaiting scope
0 ft²
Area outside quote
0 ft²

Proposal B

Area included in quote
500 ft²
Area awaiting scope
0 ft²
Area outside quote
0 ft²
Edit room measurements and written scope

For vaulted ceilings, enter the rise from the eaves to the ridge. Enter cutouts as measured on the ceiling plane. Use a separate room for each distinct profile or inspection finding.

Record the assessment for the material and area in this room. Quote scope comes from the written proposal for the selected action.

Room 1 · Living room

Included in priced area

Included in priced area

Room 2 · Hall

Included in priced area

Included in priced area

Room 3 · Studio

Included in priced area

Included in priced area

Edit Proposal A quote prices

Enter the written quotes in USD. Use 0 for work included in another line. Finishing rates apply to all areas included in that proposal.

Rates by ceiling area
Fixed quote amounts
Edit Proposal B quote prices

Enter the written quotes in USD. Use 0 for work included in another line. Finishing rates apply to all areas included in that proposal.

Rates by ceiling area
Fixed quote amounts
Show quote and line-item ledger
Ceiling quote line amounts and covered areas
LineProposal AProposal B
Removal$480.00320 ft²$0.000 ft²
Covering$0.000 ft²$640.00320 ft²
Professional removal$0.000 ft²$900.00180 ft²
Professional covering$585.00180 ft²$0.000 ft²
Finishing$600.00500 ft²$550.00500 ft²
Assessment$250.00Fixed amount$250.00Fixed amount
Preparation and protection$125.00Fixed amount$90.00Fixed amount
Disposal and documentation$110.00Fixed amount$200.00Fixed amount
Other quoted costs$0.00Fixed amount$0.00Fixed amount
Complete quote$2,150.00$2,630.00

Export results

Download ceiling comparison CSV
Show selectable CSV text

How to use this calculator

  1. Enter each measured ceiling rectangle, its cross-section and openings measured on the ceiling plane.
  2. Record the written professional findings for each material scope. Use pending if that report is outstanding.
  3. Enter the work listed for each room in two quotes. When reported presence applies, record whether the selected action is included in that written professional quote scope.
  4. Enter area rates and fixed amounts exactly as stated in each quote. Enter zero for lines already included elsewhere.
  5. Review measured, priced and held area and compare only complete quote totals. Download the exact comparison as CSV.

The Formula

The mathematical logic powering this calculation is:

Use length L along the constant direction and horizontal width W across the slope. A flat ceiling has true cross-section width W. For vertical rise R, a single slope has width √(W² + R²). A symmetric vault has two planes, each with half the horizontal run, so total width is √(W² + 4R²). Multiply the true width by L. Subtract the total opening area measured on those planes. Gross horizontal footprint is L × W. Entered plane cutouts cannot exceed gross ceiling area.

Enter the professional report status for the scoped material in each room. When the report is pending, selected positive-area work stays outside a complete quote. Where a report records presence, selected work requires a matching record of the written professional scope for that proposed action. Outside-quote rooms and zero net area contribute no variable charges. Physical measurements remain visible while scope is pending.

Group eligible rooms by covering or removal and the entered report status. Multiply each group's net ceiling area by that quote's applicable rate. A separate finishing rate uses all area eligible for priced work. Enter fixed assessment, preparation, disposal/documentation and other costs from the quote. Use zero for included services and keep a known subtotal separate from any complete total. Each line rounds to cents, with half cents upward. An unpriced applicable line or held room keeps that quote incomplete.

Use up to eight measured rooms. Dimensions are 0.001–1,000 ft and rise 0–1,000 ft. Openings are 0–3,000,000 ft² and also constrained by the actual room surface. Measurements use up to three decimals and prices up to cents. The angled area comparison uses exact squared feasibility and a bounded square-root computation before price rounding. The examples use illustrative reports and entered prices. The worksheet compares recorded scope and costs and cannot determine the presence of asbestos or how material should be handled.

Worked Example

If you input:

  • Living room: 20 × 12 ft with 5 ft single slope rise and 20 ft² of plane openings. Net 240 ft².
  • Hall: 10 × 8 ft flat with no openings. Net 80 ft².
  • Studio: 10 × 16 ft symmetric vault with 6 ft rise and 20 ft² openings. Net 180 ft².
  • Documented example: Living room and hall report records absence. Studio report records presence, with a written professional quote for each selected scope.
  • Work and quote: A removal on 320 ft² and professional covering on 180 ft². B reverses those work classes. Finishing and fixed quotes entered separately.

Result:

Total measured ceiling area is 500 ft² after openings, versus 480 ft² of horizontal footprint. A adds removal $480, professionally scoped covering $585, finishing $600 and entered fixed $485 for $2,150.00. B adds covering $640, professionally scoped removal $900, finishing $550 and entered fixed $540 for $2,630.00. Both quotes include the same total area with different work choices.

Frequently Asked Questions

Why is the ceiling area greater than the floor area?

Sloped planes are longer than their horizontal projections. A symmetric vault adds two slopes. The worksheet uses the measured rise and horizontal width to calculate the gross plane surface.

How should I enter opening area?

Use the total area excluded from the quote measured on the ceiling itself. A floor-plan opening projection may have a different area on an angled plane.

What do I enter if a professional report is still pending?

Keep its status pending. If an affected room is in the proposed work scope, its area and measurements stay visible alongside the known subtotal, while the complete quote remains pending.

How do I record a professional quote for a room with reported asbestos?

Record the reported presence and enter the written professionally scoped action and quoted rate. The worksheet applies only those documented entries to the priced group.

What is the difference between a known subtotal and a complete quote?

A known subtotal adds the currently priced lines. A complete quote also requires measurements, the professional report and written scope where applicable, and prices for all selected work.

What if finishing is already included in the unit price?

Enter zero for the separate finishing line if the entered work rate already includes it. Every displayed line follows your written quote.

Similar Calculators