Termite Treatment Quote & Renewal Planner
A termite treatment quote with a lower first-year cost can become more expensive after several renewals. Enter two written quotes and compare their cumulative fees by year. Keep separate inspection charges, confirmed agreement terms, retreatment and damage repair visible. An optional hypothetical event shows what the owner would pay under the specific terms you enter.
Compare termite quotes across renewals
Find when the lower price changes and see what a qualifying repair would add to each quote.
Quote B is $80.00 lower by year 7.
Quote A by year 7
$3,010.00
Scheduled fees
- Confirmed term
- 8 years
- Retreatment
- Included
- Damage repair
- Excluded
Quote B by year 7
$2,930.00
Scheduled fees
- Confirmed term
- 8 years
- Retreatment
- Included
- Damage repair
- Capped
- Repair payout cap
- $1,200.00
- Repair deductible
- $200.00
Lower cost by year
- Years 1–5 · Quote A lower
- Year 6 · Exact tie
- Year 7 · Quote B lower
Written agreement inputs
Use 0 for a charge confirmed as free or included and ? for an unquoted fee, rate, cap or deductible. Include any year-one inspection cost in the initial amount.
Annual charges and export
Open annual quote ledger
Values are in USD. Running totals show known charges when a price, coverage term or renewal year is missing.
| Year | Initial | Renewal | Inspection | Scheduled total |
|---|---|---|---|---|
| 1 | $850.00 | $0.00 | $0.00 | $850.00 |
| 2 | $0.00 | $360.00 | $0.00 | $1,210.00 |
| 3 | $0.00 | $360.00 | $0.00 | $1,570.00 |
| 4 | $0.00 | $360.00 | $0.00 | $1,930.00 |
| 5 | $0.00 | $360.00 | $0.00 | $2,290.00 |
| 6 | $0.00 | $360.00 | $0.00 | $2,650.00 |
| 7 | $0.00 | $360.00 | $0.00 | $3,010.00 |
| Year | Initial | Renewal | Inspection | Scheduled total |
|---|---|---|---|---|
| 1 | $1,250.00 | $0.00 | $0.00 | $1,250.00 |
| 2 | $0.00 | $220.00 | $60.00 | $1,530.00 |
| 3 | $0.00 | $220.00 | $60.00 | $1,810.00 |
| 4 | $0.00 | $220.00 | $60.00 | $2,090.00 |
| 5 | $0.00 | $220.00 | $60.00 | $2,370.00 |
| 6 | $0.00 | $220.00 | $60.00 | $2,650.00 |
| 7 | $0.00 | $220.00 | $60.00 | $2,930.00 |
Copy exact CSV
How to use this calculator
- Start with the renewal crossover example or add the illustrative repair event. Set the number of service years you want to compare.
- For each quote, enter all initial and year-one fees and the confirmed agreement term. Enter the first renewal, any annual increase, and any separate annual inspection amount.
- Choose the retreatment and damage repair terms from the written agreement. If it covers repair, enter any deductible and the payout cap if one applies.
- To test one qualifying event, enter the year and the same retreatment and damage invoices for both quotes. Compare scheduled cost with the owner-paid cost in that event.
- Check the chart's lower-price periods, expand the year-by-year ledger and download or select the CSV for your records.
The Formula
The mathematical logic powering this calculation is:
Year 1 includes the entered initial treatment amount and any first-year service fees. Year 2 adds the first quoted renewal and any separate inspection charge. Each later renewal equals the previous billed renewal multiplied by 1 + the entered annual increase percentage ÷ 100, then rounded to the nearest cent with half a cent rounded up. The separate inspection charge stays constant and applies every renewal year. Enter zero for a fee confirmed as included or free; use ? when the amount or percentage is unquoted. A zero renewal stays zero under the modeled percentage rule. Rates and agreement terms are supplied inputs. Enter the years for which the provider has confirmed availability and keep price changes separate from that term.
Cumulative scheduled fees add the initial treatment, renewal and inspection lines through the selected year. A year beyond the entered term has no known contract cost. The worksheet retains sums of known lines but requires both complete totals to identify the lower price or a tie. A quoted low cost does not establish equivalent coverage. Show written inclusions and exclusions alongside the arithmetic.
The optional event takes place after the scheduled charges in its selected service year. The model assumes it meets the entered terms for each active quote. If retreatment is included, the owner pays zero for the entered visit. Excluded retreatment adds the full entered invoice. For capped damage repair, provider payout = min(payout cap, max(0, repair invoice − deductible)). Owner repair cost = repair invoice − provider payout. For repair with no cap, the owner pays the lesser of the deductible and the invoice. Excluded repair adds the entire invoice. Unclear terms leave the event subtotal incomplete unless the amount is determined exactly, such as a zero invoice or confirmed zero cap. After the entered agreement term, no claim amount is inferred. Cumulative cost with the event adds the owner's costs once, beginning in the selected year. Disable the event for scheduled fees alone.
The total comparison and confirmed agreement terms accept 1–30 whole service years. Charges, caps and deductibles are 0 to 1,000,000 USD per entry, with up to two decimals. Renewal increases are 0–25% with up to two decimals. Enter decimals without comma separators. A typed blank is invalid when its field is active. Years are service intervals starting with the initial charge. The worksheet uses nominal dollars and models one event, a constant annual inspection charge, and one stated increase convention. Confirm deductions, exclusions, tax, actual invoices, the payment schedule and service coverage from the contract. The numbers do not estimate market prices, predict damage, or determine coverage eligibility.Method sources
Worked Example
If you input:
- Years to compare: 7
- Quote A: $850 initial, $360 per renewal, inspection included
- Quote B: $1,250 initial, $220 per renewal, $60 annual inspection
- Agreement terms: 8 confirmed service years each, 0% renewal increase
- Hypothetical event: Off
Result:
Six renewals bring the scheduled totals to $3,010.00 for Quote A and $2,930.00 for Quote B. Quote A is lower through year 5, the prices tie at $2,650.00 in year 6, and Quote B is $80.00 lower by year 7.
Frequently Asked Questions
Why do the quotes tie before one becomes cheaper?
An upfront price difference can be offset by lower renewal or inspection charges. This chart compares billed totals at each service year and reports exact ties at those yearly points.
Where should I enter the first annual renewal?
The first renewal goes in the year-two field. Include any known year-one inspection charge in the initial amount, and enter separate inspections from year 2 onward in the annual field.
What is the difference between retreatment and repair coverage?
Retreatment describes service if termites return under the written terms. Damage repair is a separate obligation and can have a payout cap, deductible or exclusions. Compare both provisions before interpreting a price difference.
What should I enter when the renewal price is unconfirmed?
Enter ?. Affected years keep the known charges visible but show no complete total. A confirmed free charge is zero.
How should I interpret years beyond the agreement term?
The comparison leaves costs incomplete after the confirmed years. Copy any confirmed renewal term into the worksheet and check terms such as reinstatement or reinspection independently.
Does the repair scenario establish what a provider will pay?
It applies your supplied cap and deductible to one hypothetical eligible event. The provider's contract and assessment determine actual eligibility, scope, payout and invoicing.
Similar Calculators
Home Inspection Cost Calculator & Quote Planner
Compare written home inspection fees, selected add-ons, and expected report timing against a contract deadline and review buffer you enter.
Foundation Repair Quote & Depth Planner
Compare foundation repair quotes across supplied pier depths. Audit included-depth allowances, per-pier billing increments, fixed scope and missing prices.
Water Damage Repair Cost Planner
Compare water damage repair quotes from measured scope and supplied equipment durations. Audit unpriced work, rental minimums, hourly billing and budget gaps.
