Roof Coating Cost Calculator & Dry-Film Band

Copy the documented spread per coat and lower and upper volume-solids values for both offers. Compare their theoretical dry film through the entered identical coats over the same measured roof area. Review which full bands reach the entered threshold and compare the quantities and costs of whole pails.

Roof coating material comparison

Compare roof coating film and pail costs

Quote A costs less among the two qualifying dry-film bands.

Quote A

25–27 mils theoretical dry film

Whole band reaches the target.

$810.00

4 whole pails · ≈19.63636 gal with allowance

Quote B

≈28.55417–29.8375 mils theoretical dry film

Whole band reaches the target.

$900.00

4 whole pails · 15.75 gal with allowance

Edit roof area and coating offers
Shared roof scope
Quote A coating and charges
Quote B coating and charges

Theoretical dry film through the entered coats

Each band spans the entered low and high volume-solids outcomes. The dashed target line marks 25 mils.

  • Quote A
  • Quote B
Dry-film band by completed coatQuote A 25 to 27 mils. Quote B ≈28.55417 to 29.8375 mils.016.132.2012
Completed coats · vertical scale in dry mils
Review coats and liquid purchase ledger

Quote A

  • After coat 1 · 12.5–13.5 dry mils
  • After coat 2 · 25–27 dry mils
Volume before allowance
≈18.7013 gal
Stock allocated
0 gal
Bought liquid and surplus
20 gal purchased · ≈0.36364 gal surplus
Delivery charged
$90.00

Quote B

  • After coat 1 · ≈14.27708–14.91875 dry mils
  • After coat 2 · ≈28.55417–29.8375 dry mils
Volume before allowance
15 gal
Stock allocated
0 gal
Bought liquid and surplus
20 gal purchased · 4.25 gal surplus
Delivery charged
$80.00

Show coating quote CSV text

How to use this calculator

  1. Enter the measured roof area and documented dry-film target. Set the material allowance for the quote.
  2. Select the units from each quoted spread and enter its per-coat value, volume-solids endpoints and number of identical coats.
  3. Add compatible stock, usable liquid per pail and the written material charges.
  4. Compare the coverage bands and review exact figures in the pail and film CSV.

The Formula

The mathematical logic powering this calculation is:

A mil is one thousandth of an inch. If a rate is entered in US gallons per 100 ft² per coat, multiply it by 385/24 to get theoretical wet mils. This follows from 231 in³ per US gallon and 144 in² per ft². Use the documented applied spread. Enter the lower and upper volume-solids values on the product’s applicable basis, with the same value in both fields when you have a single stated solids value.

For each endpoint, theoretical cumulative dry mils equal wet mils per coat times the entered number of identical coats times the solids fraction. The lowest endpoint determines whether the whole entered band reaches the dry-thickness target. A high endpoint exactly equal to target qualifies as partial when the lower endpoint remains below. This is a theoretical film range over a uniform, measured area. Actual measurements, surface roughness, thinning, uneven spread and product-specific factors can change the outcome. The range is not a statistical guarantee.

Theoretical wet liquid equals area times total wet mils times 144 divided by 231,000, in US gallons. Multiply by one plus the entered material allowance fraction. Allocate compatible liquid already available, then buy the smallest whole number of pails whose usable contents cover the remainder. Charge pails plus one delivery if a purchase is required. The allowance changes liquid ordered without changing the modeled film. When both bands meet the target, compare costs and show exact ties. A quoted plan with a partial or below-target band has a visible material estimate without entering the ranking.

Enter 1–100,000 ft², one to six identical coats, wet spread 0.1–250 mils or 0.01–15 gal/100 ft² per coat, volume solids 0.01–100% and allowance 0–100%. Use the recorded dimensions, quote and product documentation for the existing plan. The sample figures are illustrative and do not reproduce the linked products. The worksheet covers theoretical uniform film and entered material pricing. System selection, substrate suitability, weather, installation, workmanship, approval and other project fees require independent confirmation.

Worked Example

If you input:

  • Roof: 750 ft², theoretical dry target 25 mils, 5% material allowance.
  • Quote A: 20 wet mils twice with 62.5–67.5% solids, 5-gal pails at $180 and $90 delivery.
  • Quote B: 1 US gal/100 ft² twice with 89–93% solids, 5-gal pails at $205 and $80 delivery.

Result:

A spans 25–27 theoretical dry mils and B spans about 28.55–29.84. Both meet a 25-mil target. A costs $810.00 and B costs $900.00. At 25.000000000001 mils A only partially reaches the target and B’s whole band still meets it.

Frequently Asked Questions

Are wet mils the same as dry mils?

Wet thickness includes the liquid before film formation. Under the theoretical model the solids fraction converts wet mils to dry mils.

How do I enter a rate stated per roof square?

Choose gallons per 100 ft² per coat. Confirm whether the published quantity applies to one coat or the completed system.

Why does a material allowance not increase the dry-film band?

It reserves extra liquid for purchasing. The wet rate on the roof in the modeled plan is unchanged.

What does a partial band tell me?

Some entered solids outcomes reach the target and some fall below it. The pricing comparison includes only the quotes whose entire modeled band reaches the target.

Does this verify the dry film on the finished roof?

The worksheet estimates specified film from the recorded spread and solids assumptions. Actual installed thickness requires the applicable measured verification.