Powder Coating Color Lot & Quote Planner

Group parts by the same quoted finish, then compare suppliers that use different billing minimums. Follow the written part allowance in each color lot, inspect the coating top-up assigned to each billing group, and see exactly when one more part changes which bid costs less.

Written powder coating bids

Compare powder coating color lots and quotes

Group parts by finish, compare coating minimums, and see what changes when the next lot opens.

Quote B is $20.00 lower.

Quote A · Per color minimum

$267.00

Written order total

2 minimum billing groups

Scope matched

Quote B · Per color lot minimum

$247.00

Written order total

3 minimum billing groups

Scope matched

Total parts
14
Active colors
2
Prep units
7
Masking units
4

Color lot allocation and minimums

For a per-lot minimum, fill each color’s quoted allowance in the order of the part rows. Confirm this billing order with the supplier.

Quote A · Per color

  • Color 1

    Row 1: 7 · Row 2: 4

    Coating extension
    $127.00
    Minimum top-up
    $0.00
    Billed coating
    $127.00
  • Color 2

    Row 3: 3

    Coating extension
    $36.00
    Minimum top-up
    $44.00
    Billed coating
    $80.00

Quote B · Per color lot

  • Color 1 · Lot 1

    Row 1: 6 · 6 of 6 slots

    Coating extension
    $42.00
    Minimum top-up
    $7.00
    Billed coating
    $49.00
  • Color 1 · Lot 2

    Row 1: 1 · Row 2: 4 · 5 of 6 slots

    Coating extension
    $67.00
    Minimum top-up
    $0.00
    Billed coating
    $67.00
  • Color 2 · Lot 1

    Row 3: 3 · 3 of 6 slots

    Coating extension
    $33.00
    Minimum top-up
    $16.00
    Billed coating
    $49.00

Compare quantities and lot boundaries

Change one part row’s quantity and hold all other parts fixed. Quote changes can occur at the minimum or the written limit.

Entered price by selected part quantity
Plot range $177.00 to $1,070.00Selected 7 parts
Powder coating prices by selected part quantityEntered totals at each whole-part count. Selected 7 parts on row 1. Quote B is $20.00 lower.04080
Quote AQuote BParts on the selected row
  • 0–2 · Quote B lower
  • 3 · Quote A lower
  • 4–8 · Quote B lower
  • 9 · Quote A lower
  • 10–14 · Quote B lower
  • 15 · Quote A lower
  • 16–20 · Quote B lower
  • 21 · Exact tie
  • 22–80 · Quote B lower

Part quantities and finish colors

Assign the same group only when both quotes use the same written finish. Enter any separate prep and masking units.

Edit part rows (3)
Part row 1
Part row 2
Part row 3

Written coating terms

Match the prep, masking and finish scope. Use 0 for included charges and ? for unknown. Leave the last priced order size blank when no cap applies.

Edit both coating quotes
Quote A terms
Quote B terms

Coating and separate charges

Review written charge totals

Quote A

Billed coating
$207.00
Separate prep
$14.00
Separate masking
$16.00
Other fixed fees
$30.00

Quote B

Billed coating
$165.00
Separate prep
$14.00
Separate masking
$20.00
Other fixed fees
$48.00

How to use this calculator

  1. Enter the quantity and written color group for each part row. Add only the separately quoted prep and masking units.
  2. Enter each supplier’s per-part rates, scope, minimum basis and other charges. For a per-lot quote, confirm its allowance and billing row order.
  3. Inspect how each quote groups the parts. Change one row’s quantity to see the cost of opening another lot and verify each top-up.
  4. Download the CSV to audit the selected allocation and every whole-part quantity scenario.

The Formula

The mathematical logic powering this calculation is:

Enter up to four part rows. Use the same numbered color group when written terms allow those parts to share a finish. Each part counts as one unit against the entered supplier lot allowance. The lot view is a billing allocation based on whole parts.

A per-job minimum makes one group from the entire order. A per-color minimum makes one billing group per active color. For a per-lot minimum, group by color first, then fill each issued allowance in the order of the part rows. Use this option when the supplier confirms this allocation rule and a common number of parts per lot. Confirm separately if there are part-dependent capacities or different lot contents.

Each billing group has extended coating equal to the sum of quantities × quoted per-part rates. Top-up is the larger of zero and the written minimum minus that extension. Billed coating equals the extension plus the top-up. Add prep and masking units × their written unit rates, plus other fixed fees once. These separately entered charges are outside the coating minimum. Use zero for confirmed included amounts. Use ? or a blank for an unknown price. Count zero parts as no order and zero charge.

A known floor is the sum of the larger of the indicated minimum and known coating charges for each confirmed group, plus separately known fees. When the lot allowance is missing, the known floor retains known coating extensions and fees only. An unknown price, unconfirmed limit or different scope leaves the comparison unresolved. The last priced order size applies to the total number of pieces. The exact limit is included, and an order above it has no extrapolated price. Leave the limit blank only when no written cap applies.

Explore quantities 0–80 for one part row with the others held fixed. An added unit can open a new minimum. When parts have different rates, the minimum top-ups can also shrink as the written allocation shifts. Each range shows the lower complete matched quote. Input quantities and lot allowances are whole numbers, with up to 80 parts per row and 1–80 per written lot. Prep units support 0–10 per part and masking units 0–20 per part. Prices allow up to two decimals, $10,000 per part or unit and $1,000,000 per minimum or fixed fee. All examples use illustrative prices and allowances.

Worked Example

If you input:

  • Color 1: Seven brackets followed by four rails, with prep on each bracket and one masking unit per rail.
  • Color 2: Three handles with no separate prep or masking fee.
  • Quote A: $80 minimum per color with separately priced prep, masking and fixed fees.
  • Quote B: $49 minimum per lot with up to six parts per color lot. Price and fill parts in the written row order.

Result:

A totals $267 and B totals $247 with seven brackets. With nine brackets, B opens another color lot and totals $299 while A totals $289. At ten brackets, B totals $293 as the allocation changes again.

Frequently Asked Questions

When can different parts count toward the same powder coating minimum?

Use the supplier’s confirmation that those part rows share a written finish and can be grouped. A per-color minimum groups the confirmed rows together, while a per-lot minimum may divide the group at the stated allowance.

Why can another part make the per-lot quote cheaper?

With different rates on the same-color rows, an added part changes which later parts fall together. The resulting minimum top-up can shrink by more than the added coating price.

Do preparation and masking count toward the minimum?

Enter separately quoted preparation and masking outside the coating minimum. If the provider includes them in a coating rate entered elsewhere, record zero separate charge.

What happens if a lot allowance is missing?

The calculator can show known price lines. Confirm the written allowance before using the per-lot total and comparison.

Similar Calculators