Car Paint Job Cost & Quote Audit

Enter the same exterior panel and supporting work list for two body shop quotes. See documented costs, separate charges versus package inclusions, missing work and the add-on price that would make two otherwise matched quotes tie.

Written quote worksheet

Compare car paint estimates panel by panel

Match refinishing and basecoat blending scope, then compare two written body shop quotes on the same price basis.

Documented totals and quote coverage

Quote A $1,195.00. Quote B $1,480.00. Scope differs or is unconfirmed.

Quote A

$1,195.00

Documented subtotal

5 of 6 scopes covered

  • Left front door · Unclear

Quote B

$1,480.00

Documented subtotal

6 of 6 scopes covered

Scope differs or is unconfirmed

Quote A ties if its added charge for Left front door is $285.00.

Requested panels and written prices

Name each panel once. Use the written scope to distinguish refinishing from an adjacent basecoat blend.

Panel 1
Panel 2
Panel 3

Other requested work

Select scopes that belong in both comparisons. Record a bundled price once, then mark the other covered lines Included elsewhere.

Other body preparation
Trim removal and refit
Paint and materials

Where the written price goes

Both bars use the same dollar scale. Only separate charges contribute to bar length.

Separately priced cost by scope (USD)

Quote A$1,195.00

Quote B$1,480.00

$0.00$1,480.00

Refinish
A · $920.00
B · $1,020.00
Color blend
A · $0.00
B · $180.00
Prep
A · $125.00
B · $110.00
Trim
A · $0.00
B · $45.00
Materials
A · $150.00
B · $125.00

Scope ledger and export

Open matched-scope ledger
Shared work and each quote’s coverage and listed cost
Requested scopeWorkQuote AQuote B
HoodPanel refinish$520.00$570.00
Left front fenderPanel refinish$400.00$450.00
Left front doorBasecoat blendUnclear$180.00
Other body preparationBody preparation$125.00$110.00
Trim removal and refitTrim removal and refitIncluded elsewhere$45.00
Paint and materialsPaint and materials$150.00$125.00
Download paint quote CSV
Open CSV text

How to use this calculator

  1. List the exterior panels and distinguish each written refinish from an adjacent basecoat blend.
  2. Transcribe each shop’s separate price and mark confirmed package coverage, exclusions and unclear lines.
  3. Select the preparation, trim and paint/material scopes you want to compare on the same fee and tax basis. Count each written charge once.
  4. Check both coverage counts before using a lower-price result. Export the worksheet for follow-up on missing work.

The Formula

The mathematical logic powering this calculation is:

Use a shared list of requested exterior panels. For each panel enter one written work scope, panel refinishing or an adjacent basecoat color blend. A basecoat blend concerns extending color into a nearby area for color matching. Keep whole-panel refinishing, color blending and any quoted clearcoat work clear in the underlying estimates. This comparison does not select refinishing procedures, verify workmanship or establish what any specific vehicle needs.

For each bid, mark each shared panel and the listed selected preparation, trim removal/refit and paint/material scopes as priced separately, included elsewhere, excluded or unclear. Optional scopes you leave unselected are outside both quotes in this comparison. Keep the underlying charged scope aligned before comparing totals. A separately written zero price is valid. Use Included elsewhere when the written estimate covers the scope within another entered amount or expressly lists no additional charge. Enter a package price once in its most descriptive line and mark other confirmed package items included. Assign each quote's body prep and materials to the appropriate separate lines only when separately charged. Some written estimates group paint and materials using a quoted amount based on labor hours or actual cost. Transcribe the final written amount on one comparable basis across both quotes.

Each documented subtotal is the sum of that quote’s entered separately priced amounts. The cost chart divides that total into panel refinishing, basecoat blends, body preparation, trim and materials. Excluded and unclear scopes have unknown comparable costs. Their blanks do not count as zero-cost coverage. When either quote has a gap, the report shows the written subtotals and follow-up scopes and withholds the matched price comparison. If all work is priced separately or confirmed included in both quotes, compare B minus A and distinguish exact equality.

With exactly one missing line in one quote and all scopes confirmed in the other, the equal-price add-on is the complete subtotal minus the incomplete documented subtotal. This is conditional on that same requested work being covered, with all other costs fixed. A zero gap means the unpriced scope needs coverage without an additional charge to tie. A negative gap means any nonnegative added charge leaves that quote higher. The computed amount is a comparison boundary and carries no prediction about what a shop will quote.

Enter 1 to 12 distinct panel names of at most 60 characters and separate charges from $0 to $1,000,000 with up to two decimals. Exact cent sums compare the same tax, fee and discount basis for both quotes. The worksheet does not calculate tax or infer a market price, payment responsibility, warranty or coverage.

Worked Example

If you input:

  • Requested panels: Hood and left front fender refinishing. Left front door basecoat blend.
  • Quote A: $520 hood, $400 fender, door blend unclear, $125 other body preparation, trim bundled, $150 materials.
  • Quote B: $570 hood, $450 fender, $180 door blend, $110 other body preparation, $45 trim, $125 materials.

Result:

A lists $1,195.00 and B lists $1,480.00. The door blend needs clarification in A before comparing matched totals. If A adds $285.00 for that scope with all other lines unchanged, the quotes tie.

Frequently Asked Questions

What if a quote lists one package price?

Record the price once and mark every other requested line Included elsewhere only where the package expressly covers it.

Does a basecoat blend count as the same scope as refinishing?

The requested panel rows distinguish those two written roles so you can check that both quotes cover the same work. A panel row may represent a scope whose written price includes other documented layers.

How should I enter paint materials that are priced per labor hour?

Use the shop’s written final amount for those materials. Track it separately only if it is not already in another amount you entered.

What if a trim or prep step is bundled or explicitly no charge?

Select Included elsewhere for confirmed package coverage, or enter $0 if the quote documents that line separately at zero. Both states count as covered.

Why is there no lower-price result even though one subtotal is smaller?

Compare the documented scope first. An excluded or unclear line can change the final amount. The report points to every unconfirmed item and gives a conditional tie amount when just one line is missing.

Similar Calculators