Pond Salinity Calculator & Water Exchange Comparison
Start with a measured pond volume and dissolved salt reading. Compare two fixed exchange percentages and refill salinities over the same number of cycles. The timeline shows the first and last modeled results in your entered band and the cumulative refill volume.
Compare two pond salinity exchange plans
Model how two fixed drain-and-refill schedules move measured salinity toward an entered band.
Compare the exchange cycles
- Plan A
- Plan B
Cycle 3
Plan A · 959.375 mg/L
Within target band · 900 US gal refilled
Plan B · 1,243.6 mg/L
Above target band · 720 US gal refilled
Review cycle schedule and export CSV
| Cycle | Plan A salinity (mg/L) | Plan B salinity (mg/L) | Plan A refill (US gal) | Plan B refill (US gal) |
|---|---|---|---|---|
| 0 | 2,000Above target band | 2,000Above target band | 0 | 0 |
| 1 | 1,550Above target band | 1,690Above target band | 300 | 240 |
| 2 | 1,212.5Above target band | 1,442Above target band | 600 | 480 |
| 3 | 959.375Within target band | 1,243.6Above target band | 900 | 720 |
| 4 | 769.5313Below target band | 1,084.88Above target band | 1,200 | 960 |
| 5 | 627.1484Below target band | 957.904Within target band | 1,500 | 1,200 |
| 6 | 520.3613Below target band | 856.3232Within target band | 1,800 | 1,440 |
How to use this calculator
- Enter the measured pond volume and a starting concentration in mg/L on the same measurement basis as the refill readings.
- Enter the lower and upper target concentrations and how many complete cycles to compare.
- Enter each scenario’s exchange percentage and refill salinity.
- Compare the first and last qualifying cycles and the refill water used by each first hit.
- Switch the chart between salinity and refill volume, inspect a cycle, and export the exact schedule.
The Formula
The mathematical logic powering this calculation is:
For a cycle that replaces fraction f of a pond at constant starting volume, the mixed post-cycle concentration equals (1 − f) × previous concentration + f × refill concentration. Enter f as a percentage of the entire pond volume. The worksheet assumes the drained water has the current uniform concentration, then mixes the replacement water fully at restored volume. Each plan applies one fixed exchange fraction and one refill concentration throughout the entered horizon. Cycle 0 is the unaltered pond before any refill. A zero fraction keeps the starting concentration in every cycle. An exchange of 100% gives the refill concentration at the first modeled endpoint.
Cumulative refill is pond volume × exchange fraction × completed cycles. The dissolved salt mass shown in the CSV is concentration in mg/L × pond volume in litres ÷ 1,000,000 to get kilograms. This uses 3.785411784 litres per US gallon. Results use the same user-entered dissolved salt measure throughout. Chloride, specific conductance and dissolved salt concentration are distinct measurements.
Use 1–20,000,000 US gal, 0–50,000 mg/L, 0–100% exchange and 1–24 whole cycles. Decimal inputs accept up to three places. A cycle qualifies when its exact concentration lies between the entered minimum and maximum inclusive. The first and last hits are sampled endpoints within this horizon. Chart lines connect endpoints to guide comparison. A line may pass through the band between endpoints without any counted hit. The model retains exact rational values for checks and CSV. Screen values are rounded for readability.
The example shows illustrative numbers. Use matching measurements and an independently established target band. The mass balance omits evaporation, rainfall, seepage, other inflows, incomplete mixing, ongoing salt inputs and biological response. It assesses entered numerical scenarios, with no treatment or recommended exchange schedule.Worked Example
If you input:
- Measured pond volume: 1,200 US gal
- Starting salinity: 2,000 mg/L
- Target minimum and maximum: 800–1,000 mg/L
- Cycles to compare: 6
- Plan A: 25% exchange with 200 mg/L refill
- Plan B: 20% exchange with 450 mg/L refill
Result:
Plan A first reaches the band at cycle 3, with 959.375 mg/L and 900 US gal of cumulative refill. It drops below the band at cycle 4. Plan B first reaches it at cycle 5, using 1,200 US gal of refill, and remains within the band at cycle 6.
Frequently Asked Questions
Will the same exchange lower salinity by the same amount each time?
Each identical cycle replaces the same fraction of the remaining difference between the pond and refill concentrations. In general the change gets smaller as the pond reading moves closer to the refill reading.
Why can high-salinity refill water raise the result?
The result is a weighted average of the pond and refill readings at every cycle. When the refill reading is higher, any positive exchange moves the pond reading upward in this model.
Does a value exactly at a target boundary count?
Both endpoints are included. Equal minimum and maximum values define a single exact target. The worksheet tests full-precision values before rounding for display.
What if the line passes through the band but the summary says no hit?
The worksheet tests completed cycle endpoints only. If one sampled value is above the band and the next below, the connecting line does not imply a qualifying completed cycle.
Why might a plan enter the target range and then leave?
A continued sequence moves toward the refill reading. A refill reading outside the band can pull the pond result past the opposite boundary in later cycles. The worksheet identifies the last qualifying sampled cycle.
What does cumulative refill mean at cycle zero?
Cycle zero represents the entered starting concentration before any exchange. If that concentration qualifies, the first hit uses zero refill.
Similar Calculators
Pond Liner Size & Purchase Planner
Size a one-piece pond liner, compare roll cuts and stock sheets in both orientations, and inspect surplus, quote totals and extra-edge allowance scenarios.
Pool Salt Calculator
Estimate pool salt mass from measured and target salinity, water volume and purity. Compare the amount to add with whole bags to buy and measurement scenarios.
Aquarium Gravel, Substrate & Water Calculator
Calculate how much aquarium gravel or substrate to buy and how much water fits. Compare slopes, pore space, hardscape and whole bag costs.