Electric Service Upgrade Bid & Utility Allowance Planner
Enter written panel and service upgrade bids for the same scope. Track who receives each payment and which utility charges qualify for any confirmed allowance. Compare net project cost with the peak cash needed across your written dates.
Compare electrical bids and utility payments
Read the net project cost and see how much cash you need before the written returns arrive.
Use dates from your written terms in YYYY-MM-DD format. Enter ? for an unconfirmed amount and 0 for a confirmed zero.
Net cost and peak cash
Quote A is $380.00 lower in net cost.
Quote B needs $2,620.00 less peak cash.
Quote A
Written scope matched
- Net cost
- $6,170.00
- Peak cash
- $9,170.00
$1,670.00 above available cash at peak. First shortfall Dec 18, 2026.
Quote B
Written scope matched
- Net cost
- $6,550.00
- Peak cash
- $6,550.00
$950.00 available at peak.
Payment date explorer
Scale $0 to $9,170.00. Each date rises for payments first, then falls for settled returns.
- Quote A
- Quote B
- Available cash
Quote A · Dec 18, 2026
- Opening outlay
- $5,670.00
- Payments due
- $3,500.00
- Before same-day returns
- $9,170.00
- Cash returned
- $0.00
- Closing outlay
- $9,170.00
Quote B · Dec 18, 2026
- Opening outlay
- $2,000.00
- Payments due
- $3,700.00
- Before same-day returns
- $5,700.00
- Cash returned
- $0.00
- Closing outlay
- $5,700.00
Project and cash on hand
Edit Quote A written terms
Edit Quote B written terms
Review amounts and payees
Quote A
- Charges and deposits before credit
- $9,170.00
- Confirmed allowance
- $2,000.00
- Allowance used on invoice
- $0.00
- Allowance returned later
- $2,000.00
Contractor advance
Paid to electrician
Dec 3, 2026 · $900.00
Contractor balance
Paid to electrician
Dec 18, 2026 · $3,500.00
Permit payment
Paid to permitting office
Dec 4, 2026 · $320.00
Site restoration
Paid to site contractor
No separate cash line · $0.00
Utility invoice payment
Paid to utility
Dec 10, 2026 · $3,250.00
Separate utility deposit
Paid to utility
Dec 10, 2026 · $1,200.00
Utility allowance return
Returned by utility
Jan 15, 2027 · -$2,000.00
Utility deposit return
Returned by utility
Jan 29, 2027 · -$1,000.00
Quote B
- Charges and deposits before credit
- $7,550.00
- Confirmed allowance
- $1,000.00
- Allowance used on invoice
- $1,000.00
- Allowance returned later
- $0.00
Contractor advance
Paid to electrician
Dec 3, 2026 · $1,200.00
Contractor balance
Paid to electrician
Dec 18, 2026 · $3,700.00
Permit payment
Paid to permitting office
No separate cash line · $0.00
Site restoration
Paid to site contractor
Dec 20, 2026 · $850.00
Utility invoice payment
Paid to utility
Dec 10, 2026 · $800.00
Separate utility deposit
Paid to utility
No separate cash line · $0.00
Utility allowance return
Returned by utility
No separate cash line · $0.00
Utility deposit return
Returned by utility
No separate cash line · $0.00
Export bid and payment ledger
Show CSV text
How to use this calculator
- Choose the work described in both written bids and indicate whether site restoration belongs in the comparison.
- Enter the electrician total and payment split. Mark permit and restoration payments as bundled, direct, omitted or pending.
- Enter the utility invoice before credit, any separately confirmed eligible allowance or deposit return, and the exact due and return dates.
- Compare net cost and peak cash. Review one date at a time or export all payees, amounts and dates to a CSV.
The Formula
The mathematical logic powering this calculation is:
Record the written work as panel only, panel and service, or service relocation. Choose whether these bids must include site restoration. Each quote distinguishes the electrician's total, direct permit and restoration charges, utility charge and separate utility deposit. A confirmed bundled charge stays in the contractor total. An excluded restoration line leaves the requested scope unmatched when restoration is required. Enter zero for a confirmed zero amount, and ? or blank when an amount is unconfirmed.
The contractor advance is part of the contractor's total. The contractor balance is the total minus the advance. Both are payable to the electrician. Direct permit and restoration payments are assigned to their own payees. Copy the utility service charge before any separately recorded credit. One confirmed allowance may be either an invoice offset or a later cash return. Apply the smaller of the written maximum allowance and the amount identified as eligible on the utility charge. The eligible amount cannot exceed that charge. The deposit has its own payment and written return. Its return cannot exceed the deposit. A confirmed zero-dollar line needs no date.
Charges and deposits before credit add the contractor total, direct fees, utility charge and deposit. Net project cost subtracts the eligible allowance and written deposit return from that sum. An invoice offset reduces the cash paid on the invoice date. A later allowance preserves the full invoice debit and enters a separate receipt. Deposit return enters a separate receipt regardless of allowance. Refund and allowance dates cannot precede their originating payments.
For each date, add payments to the opening outlay before subtracting any cash returned that day. Peak cash is the largest outlay before same-date returns. The budget check finds the first such date strictly above the entered cash limit. The date explorer combines both complete timelines and displays the opening outlay, payments due, cash returned and closing outlay for the chosen date. Net cost can be ready while the peak is pending if a positive payment date or cash split is unknown. Both quotes must match the written work to report a winner.
All values are US dollars. Cash amounts support $0–$1,000,000 each and available cash supports $0–$10,000,000, with up to two decimals. Enter calendar days as YYYY-MM-DD from 2000 through 2200. The worksheet uses only the entered written terms. Example amounts and dates are illustrative. Confirm any third-party fee or dated return with the source before including it.Method sources
Worked Example
If you input:
- Quote A: $9,170 in charges and deposits. $2,000 of written allowance and $1,000 deposit return arrive later.
- Quote B: $7,550 in charges and deposits before a $1,000 invoice credit. No deposit.
- Available cash: $7,500
Result:
A costs $6,170 net and B costs $6,550. A needs $9,170 at peak before the returns, while B needs $6,550. With earlier written returns for A, its net cost stays at $6,170 and the peak falls to $6,170.
Frequently Asked Questions
Why can the lower-cost quote use more cash upfront?
Compare the written sequencing. A later allowance or deposit return can reduce the final net cost after you have paid the full invoice and other fees.
Do I enter my electrician's total or just the remaining balance?
Enter the full contractor total and enter the advance separately as a portion of that total. The worksheet calculates the remaining balance.
Which cost can a utility allowance reduce?
Enter only the eligible part identified in your written utility charge and the confirmed allowance limit. The allowance applies to that charge. Permit, electrician, restoration and deposit amounts are separate.
What if a return date or deposit amount is still pending?
An unconfirmed date leaves peak cash pending. An unconfirmed amount leaves any total that uses it pending. Enter confirmed zero values only when the written terms say no charge or return applies.
Can this determine which electric service I need?
Use the worksheet to compare documented work, payments and fees. Ask your electrician or utility about equipment, capacity, requirements and eligibility.
Similar Calculators
HVAC Replacement & Operating Cost Planner
Compare HVAC replacement quotes, annual heating and cooling costs, maintenance and dated repairs. Visualize nominal and discounted costs, savings and payback reversals.
EV Charging Cost Calculator
Estimate electric vehicle charging cost, trip cost, cost per mile, and gasoline-equivalent savings.
Sewer Replacement Cost & Surface Planner
Compare sewer replacement costs across pipe work, access patches and surface restoration. Visualize cost ranges, footprints, budget headroom and price crossovers.
