Dough Proofing Calculator & Rise Window

Paste elapsed times and readings for one or two dough batches. Use each batch’s starting reading as the reference and compare measured rise. If the target remains ahead, see how the latest interval rates change the projected checkpoint.

Dough rise measurements

Track dough proofing from rise readings

Batch A brackets the selected rise.
Edit readings and rise target

For each batch, enter elapsed minutes and volume or height. For height, read the same straight-sided vessel throughout.

Batch A · Recorded bracket

80.833333 min

Interpolated between 60 and 85 min.

Latest rise 46.666667% at 110 min.

Latest reading is below the target again.

Batch B · Projected target window

101.666667–105 min

Recent rises span 0.5–0.6 percentage points per minute.

Latest rise 40% at 85 min.

Dough rise over time

Solid lines connect readings. Dashed areas show the range implied by recent rates. The gold line marks the selected rise.

Observed rise and projected target timesTarget 50 percent. Batch A last measured 46.666667 percent at 110 minutes. Batch B last measured 40 percent at 85 minutes.53.3326.6700110Elapsed minutesRise (%)
  • Batch A
  • Batch B
  • Target rise · 50%
Review readings and export exact CSV
Recorded readings and normalized rise
BatchMinutesReadingRise (%)
A0300
A353413.333333
A604033.333333
A854653.333333
A1104446.666667
B0400
B304410
B605025
B855640

The target is your chosen rise checkpoint. Projections assume recent behavior continues within the selected lookahead.

How to use this calculator

  1. Paste each batch’s elapsed minutes and reading as CSV or TSV, starting at minute zero.
  2. Set the rise percentage you want to compare. Choose how many recent intervals and how much lookahead to use.
  3. Read the first recorded bracket or projection range. Use the chart to see later decreases and which estimates reach the target.
  4. Open the ledger and export readings, brackets and projection endpoints as exact CSV.

The Formula

The mathematical logic powering this calculation is:

At each recorded time, compute rise percentage as 100 × (reading − starting reading) / starting reading. Use volume or height in a straight-sided vessel with consistent cross section. Give each batch its own time-zero reading. Readings use one unit within each batch.

Take the first recorded pair with the earlier rise below the target and the later rise at or above it. Interpolate between those readings with a straight line to estimate the target time. A later drop leaves that first bracket intact. The interpolation describes the two recorded observations.

When all readings are below target, use two through five recent time intervals. Find the smallest and largest change in percentage points per minute. Any flat or falling interval or insufficient readings withholds the projection. For positive rates, divide the remaining percentage points by the fastest and slowest rates and add the latest elapsed time. These times describe two constant-rate scenarios. If the fastest exceeds your lookahead, the projection is unavailable. If only the slower time is outside, show a range that extends beyond the lookahead. The output describes a rise checkpoint, with suitability for the next baking step evaluated separately.

Enter two to thirty-six readings per batch, ordered by elapsed minutes. Time is 0–4,320 minutes; the reading is positive up to 10,000. Both use up to three decimals. The target is positive through 300%, and the lookahead is 1–240 minutes. Real-valued readings, normalization, interpolation and forecast comparisons use exact rational arithmetic before display rounding.

Worked Example

If you input:

  • Target: 50% rise
  • Batch A: 30 at 0 min, 40 at 60 min, 46 at 85 min, 44 at 110 min
  • Batch B: 40 at 0 min, 44 at 30 min, 50 at 60 min, 56 at 85 min
  • Projection: Two recent intervals, 60-minute lookahead

Result:

A brackets the selected rise between 60 and 85 minutes, with a linear estimate of 80.833333 minutes. B’s positive recent rates project 101.666667 to 105 minutes. A was below the target again by its latest reading.

Frequently Asked Questions

Can I measure dough rise with a jar?

Use a straight-sided vessel, take the initial height at minute zero, and read the same scale each time. If the vessel widens, use actual volume readings.

How do I calculate percentage rise from a height reading?

Subtract the starting height from the current height, divide by starting height, and multiply by 100.

How is the projection range calculated?

The fastest and slowest recent increases give the endpoints. The range assumes those increases continue from the latest observation within the chosen lookahead.

Why does a flat or falling reading stop the projection?

At least one recent interval fails to support a continuing increase. The chart still shows the observed change and any earlier bracket.

What changes when a reading drops after the target?

The earlier bracket remains recorded. The latest-rise result shows that the newest reading is below the target again.

Similar Calculators