Builder’s Risk Insurance Cost & Premium Timeline
Enter one construction value schedule and the premium terms quoted for it. Compare an upfront completed-value charge with monthly charges on reported values, then see how documented extension prices can change the total.
Compare builder’s risk premiums and extensions
See when two written premium schedules charge you and how a longer term changes the price.
Quote B costs $475.00 less for the entered term.
Premium comparison by added months
Open delay comparison values
| Added months | Quote A | Quote B |
|---|---|---|
| 0 | $3,270.00 | $2,795.00 |
| 1 | $3,570.00 | $3,245.00 |
| 2 | $3,870.00 | $3,695.00 |
| 3 | $4,170.00 | $4,145.00 |
| 4 | $4,470.00 | $4,595.00 |
| 5 | $4,770.00 | $5,045.00 |
| 6 | $5,070.00 | $5,495.00 |
| 7 | Unresolved | Unresolved |
| 8 | Unresolved | Unresolved |
| 9 | Unresolved | Unresolved |
| 10 | Unresolved | Unresolved |
| 11 | Unresolved | Unresolved |
| 12 | Unresolved | Unresolved |
Edit reported phases and written quotes
Enter ? for unpriced terms and 0 for included or waived fees.
Open monthly premium and fee ledger
| Period | Reported value | Quote A due | Quote B due |
|---|---|---|---|
| At start | — | $3,270.00 | $200.00 |
| Original month 1 | $200,000.00 | $0.00 | $150.00 |
| Original month 2 | $200,000.00 | $0.00 | $150.00 |
| Original month 3 | $420,000.00 | $0.00 | $315.00 |
| Original month 4 | $420,000.00 | $0.00 | $315.00 |
| Original month 5 | $420,000.00 | $0.00 | $315.00 |
| Original month 6 | $600,000.00 | $0.00 | $450.00 |
| Original month 7 | $600,000.00 | $0.00 | $450.00 |
| Original month 8 | $600,000.00 | $0.00 | $450.00 |
Open selectable CSV
How to use this calculator
- Enter the target completed amount and the monthly values written in your project timeline.
- Enter each quote’s stated value, premium basis, rate per $100, minimum and separate fee.
- Copy its authorized extension terms. Enter a delay and the expected reported value for those months.
- Review term total and charges as due over time. Use the delay view to see where the two quoted totals change.
- Download the premium timeline with its complete and unresolved rows.
The Formula
The mathematical logic powering this calculation is:
Enter one target completed value and up to three consecutive original phases. Enter the number of whole months and the same confirmed reported amount for each month in that phase. For an extension enter the number of added months and the amount used for each month. Each alternative quote uses its own written value. Check that it reaches the highest of the target completed amount and entered period amounts. This compares stated numbers only.
A completed-value quote charges the completed-value rate per $100 times the written value at the start. A monthly quote multiplies each month’s reported value by the monthly rate per $100. Round each billed amount half up to cents. Both may have a separate original-term minimum. If the sum of original premium falls below it, add the difference once to the upfront premium for the fixed option or to the final original month for the monthly option. The one-time policy fee is separate and due at the start. A written zero is valid.
Model an extension only up to the extra months stated on each quote. An extension can be charged at a written fixed amount per month or a separate rate per $100 of the entered extension value. Round extension charges per month. The original minimum applies to the original term. Later months beyond the quoted extension, and unpriced active months or fees, leave the comparable total unresolved. Use ? for an unresolved charge. Rank complete totals only after confirming matching scope and sufficient written value and term.
Use exact cents, up to four decimals in a quoted rate per $100, and 1–24 original months plus 0–12 additional months. The primary source examples describe different premium bases. Actual contracts can bill or adjust premiums in other ways. Read the written quote and use only scenarios whose pricing conventions match this arithmetic; insurance eligibility, claim recovery, coverage, legal reporting requirements and taxes are outside the model.Worked Example
If you input:
- Site schedule: Eight months. Report $200,000 twice, $420,000 three times and $600,000 three times.
- Quote A: $0.52 per $100 written completed value and $150 fee. Authorized added months cost $300 each.
- Quote B: $0.075 per $100 each reported month and $200 fee. Extension adds $0.075 per $100 per month.
Result:
At eight months Quote A totals $3,270.00, while Quote B is $2,795.00. With four added $600,000-value months, Quote A totals $4,470.00 and is $125.00 below Quote B.
Frequently Asked Questions
What is the difference between completed and monthly reported premiums?
In this worksheet the completed-value rate applies once at the start. The monthly rate applies separately to each entered value. Other policy rating conventions may use a different basis.
What if a project runs longer than the quote covers?
Enter only the extension periods stated in the quote. A later month without a stated extension is unresolved in the calculation.
Does the minimum premium move when I add months?
The entered floor applies to the original premium in this worksheet. Added months are priced from their own written rates.
Which values should I enter for the reported months?
Use the amount confirmed for reporting in the specific written quote. Accumulated spend, cash value and estimated completed value can reflect different contractual definitions.
Why does the result show a written value gap?
The target or one entered period exceeds the number stated in the quote. Check that difference with the provider before relying on the price comparison.
How do I handle insurance charges already listed together?
Use the written equivalent rate and enter zero where a charge is already included. Keep the timing and minimum basis consistent with the quote.
Similar Calculators
Construction Loan Calculator & Draw Planner
Plan construction draws and compare monthly interest payments with capitalized interest. Visualize loan balances, cash needs, fees and loan-limit shortfalls.
Home Replacement Cost Calculator & Dwelling Limit Planner
Model home rebuild cost from local rates and separate expenses. Compare it with an entered dwelling limit today and as both change over time.
Home Addition Cost & Bid Comparison Calculator
Compare home addition bids after replacing allowances and adding excluded work. See low, base and high project budgets, reserve and cost per square foot.