Winch Size Calculator by Drum Layer

Check the lowest documented line pull across a range of rope remaining on the drum. Compare two manufacturer layer tables with a specified load requirement and quoted prices.

Winch specification review

Compare winch quotes by drum layer

Quote B is the lowest-priced rating match.

Quote A
Lowest listed pull misses the requirement
Quote B
Listed pull meets the entered requirement
Edit rope lengths, requirement and quote tables

Use cumulative rope remaining on the drum. Copy the applicable retained length and line-pull ratings from the documents for each exact configuration.

Quote A
Quote A layer 1
Quote A layer 2
Quote A layer 3
Quote B
Quote B layer 1
Quote B layer 2
Quote B layer 3

Listed line pull across drum layers

The shaded window shows the inspected amount of rope on the drum. The dotted horizontal line marks the entered pull requirement.

  • Quote A
  • Quote B
Documented line pull by amount of rope remaining on the drumThe solid line is Quote A, the dashed line is Quote B. Thicker portions intersect the inspected window. At an exact layer endpoint, a dot marks an included rating.0 lbf9.5K lbf0 ft80 ft
Inspected rope-on-drum window
20 ft to 50 ft
Documented line-pull requirement
6,000 lbf
Inspect the documented layer rows

Quote A

  • Layer 1 · 0 ft to 25 ft · 8,000 lbf · intersects window
  • Layer 2 · 25 ft to 50 ft · 6,500 lbf · intersects window
  • Layer 3 · 50 ft to 75 ft · 4,900 lbf · intersects window

Quote B

  • Layer 1 · 0 ft to 28 ft · 9,500 lbf · intersects window
  • Layer 2 · 28 ft to 55 ft · 7,200 lbf · intersects window
  • Layer 3 · 55 ft to 80 ft · 6,100 lbf

Line-pull margin and quote price

Left of zero is a shortfall. Right of zero is headroom. A quote with an uncovered length has no margin bar.

Signed difference between the weakest listed pull and the requirementThe upper bar is Quote A. The lower is Quote B. Negative margins point left, and positive margins point right.AB-1,200 lbf0+1,200 lbf

Quote A

Lowest listed pull misses the requirement

Quoted price
$420.00
Documented rope range
8 ft to 75 ft
Lowest listed line pull
4,900 lbf
Signed rating margin
-1,100 lbf

Quote B

Listed pull meets the entered requirement

Quoted price
$560.00
Documented rope range
8 ft to 80 ft
Lowest listed line pull
7,200 lbf
Signed rating margin
+1,200 lbf
View CSV text

How to use this calculator

  1. Enter the same documented requirement and remaining-rope window for both quotes.
  2. Copy each quote’s minimum retained length, cumulative layer ends, line-pull ratings and price.
  3. Check chart coverage, the weakest listed rating and signed margin. Open the layer ledger to see which rows control the result.
  4. Export the comparison as CSV for your records.

The Formula

The mathematical logic powering this calculation is:

Enter a documented line-pull requirement and the lower and upper bounds of the amount of rope that remains on the drum. This is cumulative rope on the drum, using the same reference and units as the quoted layer tables. Enter the manufacturer’s retained-length requirement for the exact documented configuration, and list each layer’s cumulative upper endpoint in ascending order. Each interval begins at the previous endpoint, with zero as the first lower boundary.

A quote has full coverage when the inspected window stays at or above the entered retained minimum and at or below the last documented layer endpoint. Use the minimum listed line pull over every layer intersecting that window. At a shared endpoint use both neighboring rows and take the smaller applicable rating. This conservative comparison avoids choosing an undocumented transition side. Compare the minimum with the entered force criterion. The signed margin is the listed minimum minus the required force. A zero margin meets the entered numerical criterion. Where the chart lacks full coverage, the margin is unavailable. The cheapest quote among those clearing the criterion is shown, including both on a tie.

Use the manufacturer's figures for the same winch, rope, setup and operating conditions documented in each quote. The model screens specifications only. It does not determine required pulling force, rope or anchor suitability, shock loading, heat duty, installation, rigging or operating procedures. Illustrated rows are hypothetical. Follow the product documentation and applicable professional requirements.

Enter 0–1,000 ft remaining rope, 1–8 ordered layers, cumulative layer ends of 0.01–1,000 ft, and listed/required pull from 1 to 100,000 lbf. Enter prices from $0 to $100,000. Dimensions, force, and prices accept up to two decimals.

Worked Example

If you input:

  • Remaining rope and required pull: 20–50 ft and 6,000 lbf
  • Quote A: $420. The 50 ft shared boundary includes the 4,900 lbf third layer.
  • Quote B: $560. The window ends within its second layer at 7,200 lbf.

Result:

Within the example’s 20–50 ft window, Quote A is 1,100 lbf short and Quote B clears the criterion by 1,200 lbf. If the documented upper end is 49.99 ft, Quote A’s lowest listed rating is 6,500 lbf and it becomes the cheaper match.

Frequently Asked Questions

Why can the first-layer rating be misleading?

Layer tables may show a different line pull for each amount of rope on the drum. Compare the lowest rating in your documented range.

What length goes into each layer row?

Copy the table’s cumulative rope-on-drum length through that layer, using the same rope and length reference as the inspected interval.

Why does a layer that only touches the interval still count?

At a shared endpoint the worksheet considers both adjacent ratings. Use the weaker listed value unless your documented interval is wholly on one side.

Can I use the worksheet to calculate the force I need?

Enter a documented line-pull requirement for the planned task. Workload, friction, slope, side loads and shock loading need their own evaluation.

What if my range extends beyond the chart?

The worksheet reports the uncovered span and leaves the lowest listed pull and comparison margin blank.

Similar Calculators