Build an inventory of three groups of uniform hosts. Enter each quote's minimum cores per socket, raw storage entitlement, add-on size, scope and annual charges. Check how an exact storage threshold, clustered or pooled entitlement, and whole-block purchasing affect the total.

Written software subscription quotes

Compare server cores and storage charges

Quote B has the lower modeled annual total.
Quote A annual total
$7,700.00
128 licensed cores · 0 add-on blocks
Quote B annual total
$7,540.00
128 licensed cores · 4 add-on blocks
Physical and licensed cores by group

The first bar portion counts physical cores. The darker portion reflects additional cores from the socket floor.

  • Production48 physical · 64 licensed

    16 additional licensed cores

  • Secondary48 physical · 48 licensed

    0 additional licensed cores

  • Lab8 physical · 16 licensed

    8 additional licensed cores

Production hosts
Secondary hosts
Lab hosts
Quote A terms

Entitlement scope

Included capacity rounding

Quote B terms

Entitlement scope

Included capacity rounding

Review cluster charges and exact CSV
Local diagnostics for each host group
Quote and groupRaw TiBIncluded TiBShortfall TiBPurchase blocksLocal storage cost
A · Production64.00064.0000.0000$0.00
A · Secondary20.00048.0000.0000$0.00
A · Lab0.00016.0000.0000$0.00
B · Production64.00048.00016.0004$2,400.00
B · Secondary20.00036.0000.0000$0.00
B · Lab0.00012.0000.0000$0.00

How to use this calculator

  1. Enter each host group's population, physical sockets and physical cores. Enter raw storage contributed per host in binary TiB.
  2. Copy each annual core and storage rate, its entitlement scope, the allowance and any whole-TiB rounding specified.
  3. Review the difference in annual costs and see where extra cores or purchased storage are needed.
  4. Compare the cluster core bars with the storage view. Review the exact quote totals and local diagnostics in the ledger.

The Formula

The mathematical logic powering this calculation is:

Under the entered quote rule, physical cores in a group are host count × occupied sockets per host × physical cores per socket. Licensed cores use the greater of physical cores per socket and the quoted minimum, then multiply by hosts and populated sockets. Raw storage is host count × contributed raw TiB per host. Use separate groups for different hardware where the quote permits a shared pool.
Included storage is licensed cores × the entered TiB allowance. Where whole-TiB entitlement rounding is selected, round upward at the quoted entitlement scope. In per-cluster mode, every group computes its own entitlement, shortage and blocks. A surplus in one group cannot absorb a shortage in another. In pooled mode, first sum unrounded included amounts and raw storage across the groups. Apply optional rounding once to the pool, then calculate its shortage and blocks. Per-group diagnostics remain local estimates in pooled mode and do not assign the pooled charges back to a group.
Shortage is max(0, raw TiB minus included TiB). Additional blocks equal the ceiling of shortage divided by the quote's block size. Exact equality at the end of the last block needs no extra block. Surplus after purchase is included plus paid TiB minus raw TiB. Total annual charges equal licensed cores times per-core price, plus blocks times per-block price, plus the entered annual charge. Volume arithmetic is exact to a thousandth of a TiB, and costs use whole cents.
Each group can have 0–200 hosts. Enter 1–8 occupied sockets per host, 1–512 physical cores per socket and 0–10,000 raw TiB per host. An unused group with zero hosts has zero raw TiB. The quote minimum is 0–512, the included factor 0–1,000 TiB per core and each buyable block 1–1,000 TiB. Capacity fields allow three decimals. Annual prices and fixed fees are 0–100,000 USD per input and allow two decimals.
The manufacturer references explain physical-core count and raw storage. Use the entitlement, scope, units and pricing printed on the two selected written quotes. The examples are fictional price schedules. Capacity planning, license rights, edition availability, product migration, sales terms and taxes require separate review.

Worked Example

If you input:

  • Production topology: 2 hosts, 2 sockets each, 12 physical cores per socket, 32 TiB raw per host
  • Socket floor: 16 per populated socket in both quotes
  • Allowance: 1.000 vs 0.750 TiB per licensed core for these written examples

Result:

Both quotes model 128 licensed cores across the three groups. With production exactly at 64 raw TiB, A costs $7,700 and B $7,540 annually. Increasing production to 32.001 TiB per host changes the leader to A.

Frequently Asked Questions

How does the socket minimum affect a group?

Use the greater of the entered minimum and the physical cores per occupied socket. A dual-socket host can incur the minimum twice.

Should I enter raw storage or usable storage?

Use the same raw-capacity basis as the quote. This worksheet does not derive raw licensed TiB from usable data after RAID or protection.

Why can a pooled quote cost less?

When the quote allows it, unused included space can cover another group's shortage. Local allowances remain visible as diagnostic amounts.

Do these inputs establish VMware license entitlement?

They model the written charge and capacity terms that you enter. Verify how those terms apply to the version and products on the actual agreement.