Subscription Box Cost & Case-Pack Planner
Enter the contents and available stock for one shipment cycle. Compare two supplier and fulfillment plans at the same box count. See which component limits complete boxes, what one extra box costs and how many shipments you can fund with the cash available.
Plan a subscription box shipment
Compare two sets of supplier cases for one shipment. See what you can pack, how much cash you need and which pieces will be left.
Plan A requires less cash.
- Planned boxes
- 120
- Complete boxes from usable stock
- 20
- Plan A cash required
- $507.00
- Plan B cash required
- $508.00
Edit shipment size, stock and case quotes
Use available stock after other commitments. Include each required item, including the mailer if it’s purchased by the case.
Cash required by box count
The curves include full cases. A jump can make the next shipment size switch the lower-cost plan.
- Plan A
- Plan B
- Cash budget
- Plan A funded through
- 120 boxes
- Plan B funded through
- 121 boxes
- Cash budget
- $509.80
Complete boxes supported by each component
The shortest total bar sets the number of complete boxes these pieces can make. The dashed line marks your planned box count.
- Usable stock
- Added by cases
120 complete boxes supported
- Item 1 · Sample · 24 before / 120 after
- Item 2 · Mailer · 20 before / 120 after
- Item 3 · Insert · 125 before / 125 after
Inspect cash and case orders
Plan A
Use the sourcing plan selector above to switch between case orders.
- Bulk purchases
- $276.00
- Handling and shipping
- $216.00
- Fixed batch charge
- $15.00
Sample
- Required pieces
- 240
- Cases to order
- 4
- Pieces purchased
- 192
- Pieces left
- 0
- Purchase cash
- $192.00
Mailer
- Required pieces
- 120
- Cases to order
- 4
- Pieces purchased
- 100
- Pieces left
- 0
- Purchase cash
- $84.00
Insert
- Required pieces
- 120
- Cases to order
- 0
- Pieces purchased
- 0
- Pieces left
- 5
- Purchase cash
- $0.00
View CSV text
How to use this calculator
- Enter the planned box count for one shipment, a comparison limit and the cash budget available to fulfill it.
- List each required component including the mailer if you buy it in cases. Deduct any stock already promised elsewhere before entering usable pieces.
- Copy both suppliers’ cases, minimum order for each component and prices. Add the handling and shipping per box and any fixed batch charge.
- Compare the cash costs, affordable capacities and component surpluses. Download the per-component case order and whole-box comparison.
The Formula
The mathematical logic powering this calculation is:
For each component, required pieces equal packed boxes times pieces per box. Deduct usable stock to find the shortage. If there is no shortage, order zero cases. Otherwise divide the shortage by pieces per supplier case and round up to a whole case. Order at least the supplier’s minimum for that component if ordering it. Paid pieces can exceed the shortage. Pieces left equal usable stock plus purchased pieces minus required pieces.
Before and after ordering, divide each available component quantity by its pieces per box and round down. The smallest of those whole-box counts is the number of complete boxes supported by stock. Pack quantities describe individual usable pieces inside one quoted case. Convert nested inner packs to the actual piece count from the supplier’s documentation first.
For a positive box count, cash required equals the sum of cases times their case prices, plus handling and shipping per box, plus the fixed batch charge. At zero boxes there are no charges. Purchases have their full cash cost in this cycle. Leftover pieces remain available and earn no automatic cash credit. The chart recalculates orders and costs for each whole count through the entered comparison limit. The highest count that costs at most the entered budget is the funded capacity within that comparison. Equality qualifies, with all costs calculated in whole cents.
Enter 1–6 components, 1–20 pieces per box and 0–100,000 usable stock pieces each. Enter 1–10,000 pieces per case and 1–10,000 minimum cases when ordering a component. Planned boxes and the comparison limit accept 1–5,000 whole boxes. The budget accepts $0–$1,000,000, per-box handling and shipping $0–$10,000, and each case price and batch charge $0–$100,000. Use the same usable stock and box contents for both plans and include any agreed charges in the quote amounts. This worksheet models one shipment cycle using the entered costs. Changes in subscribers, inventory in transit, price tiers and supplier-wide minimums require separate factors or quotes.Worked Example
If you input:
- Batch and available budget: 120 planned boxes, compare through 160 boxes, $509.80 for this shipment
- Current components: 48 samples at two per box, 20 mailers at one per box and 125 inserts at one per box
- Quoted plans: Plan A buys smaller sample and mailer cases. Plan B requires three sample cases and uses a larger mailer case.
Result:
At 120 boxes, both plans fit and Plan A is cheaper by $1.00. One extra box opens a sample case and a mailer case in Plan A. Plan B can use pieces left from its larger cases and reaches 121 boxes for exactly $509.80.
Frequently Asked Questions
What is the difference between funded and supported boxes?
Funded boxes are the largest order count within your comparison limit that fits your cash. Supported boxes are the maximum complete boxes your usable stock and the cases purchased for the planned count could make.
How does the calculator use the case minimum if I already have enough stock?
The minimum applies only when there is a shortage for that component. With enough usable pieces, there is no order and no charge for that line.
Why can an extra box make the cheaper quote change?
Each component is purchased in whole cases. If the next box needs another case in one plan and there is spare stock in the other, the plans’ costs rise by different amounts.
Do leftovers reduce the amount I must pay for the cases?
You pay for all ordered cases now. The leftover pieces are shown separately so they can become available stock for a later shipment.
Does the estimate include all monthly subscriber revenue?
It estimates the cash to buy and fulfill components for one shipment. Enter a planned shipment count from your orders and copy agreed costs from your suppliers and shipper.
Similar Calculators
Corrugated Carton Packaging Cost & Blank Yield Calculator
Compare two corrugated sheet offers by carton blank layout, rotation, trim, whole-pack quantities and purchase cost.
EOQ & Inventory Ordering Planner
Compare economic order quantities with pack sizes, all-units discounts, storage and order budgets. Visualize carrying costs, stock cycles and supplier tradeoffs.
Product Pricing Calculator & Fee-Aware Margin Planner
Compare two selling prices after commission, fixed fees and fulfillment. Calculate break-even orders and the minimum price that meets your profit margin target.
Parcel Shipping Quote Planner
Compare parcel shipping tariffs and packaging alternatives. Inspect dimensional weight, billing increments, price tiers, fees and box-height sensitivity with an exact CSV export.
