Seamless Gutter Cost & Coil Quote Planner
Enter measured unspliced gutter runs for the same confirmed profile and finish. Compare two offers with entered coil stock, setup allowances and costs. See how one small coil change can require buying another.
Fit seamless gutter runs onto quoted coils
Compare compatible coil stock, length allowances and prices for one set of continuous runs.
Quote A is the lower feasible quote.
- Continuous finished run length
- 120 ft
- Whole runs
- 4
Edit runs and written coil quotes
Enter one compatible profile and finish. Copy measured run lengths and each offer’s coil allowances and prices.
How the whole runs fit on each coil
Each teal segment is one finished run. Amber marks start loss and trim. Remaining footage appears in grey.
- Finished runs
- Allowances
- Unused
- Finished runs
- 120 ft
- Total start and trim allowances
- 6 ft
- Unused coil length
- 2 ft
Inspect whole-run assignments
Remnant
Rear 35 ft · East 25 ft
- Raw length
- 65 ft
- Start and trim
- 3 ft
- Unused length
- 2 ft
New coil 1
Front 45 ft · West 15 ft
- Raw length
- 63 ft
- Start and trim
- 3 ft
- Unused length
- 0 ft
Quoted cost by new coil count
A price appears only when that count is available and can fit all runs.
- Quote A
- Quote B
- Quote A minimum order
- 1 new coil
- Quote A lowest feasible cost
- $165.00
- Quote B minimum order
- 1 new coil
- Quote B lowest feasible cost
- $190.00
View CSV text
How to use this calculator
- Enter the measured finished length of every run that must remain one piece.
- Copy each quote’s confirmed remnant and new coil feet, allowed replacement quantities, start loss and trim.
- Enter fixed quoted costs and the price per new coil on the same scope for both offers.
- Compare which complete layouts fit, inspect each coil’s used and remaining feet, and download the quote and layout.
The Formula
The mathematical logic powering this calculation is:
Enter finished lengths of straight runs that your quote requires as continuous pieces. Use one compatible profile and finish across the project and both offers. Jobsite roll forming can make continuous lengths from coil stock. Englert publishes information on portable forming and continuous elevation runs. This worksheet uses the measured lengths and reserves in your own quotes.
Reserve the entered start loss each time a coil is used. Reserve the entered trim once per finished run. The coil consumption of one run is its finished length plus trim. A run can fit only entirely on one compatible coil. A coil's used length is its start loss plus the sum of assigned run lengths and their trims. Exact equality fits. An unused remnant keeps its original length.
For each offer, consider zero through the available quantity of identical new coils alongside the measured remnant, if entered. An exact subset search assigns complete runs to coils within usable lengths. The first feasible order uses the fewest new coils. Among placements for that order, the displayed assignment fills earlier coils as much as possible while allowing completion. The process compares whole pieces even when pooled feet look adequate.
Price a feasible order as the fixed quoted job cost plus the number of new coils times the price per coil. An infeasible quote has no qualifying price. Additional authorized coil quantities are priced at the same quoted terms. Remnant cash cost should be included in the fixed quote if charged. Use the stated verification and accounting basis when entering allowances and costs.
Use 1–8 continuous runs, each from 0.01 to 1,000 feet. Enter remnant length up to 10,000 feet and new coil length from 0.01 to 10,000 feet. Enter 0–3 new coils available. Start loss and trim accept 0–100 feet. Quote amounts accept $0–$1,000,000 and time-independent costs in USD. Lengths and money accept up to two decimals. Record your supplier’s material compatibility and measured allowances separately. Drainage sizing, support, splices and machine operating choices depend on the job's approved design and supplier documentation.Worked Example
If you input:
- Finished runs: 45, 35, 25 and 15 feet
- Measured reserves: 2 feet per used coil and 0.50 foot per run
- Quote A stock: 65-foot remnant plus new 63-foot coils
Result:
Quote A uses a remnant and one new 63-foot coil for $165. The new coil is exactly full. Lowering the new coil to 62.99 feet requires two, raising Quote A to $315. Quote B still uses one new coil and costs $190.
Frequently Asked Questions
Why can the total feet be enough and the runs still fail?
Each finished run stays whole. Usable feet left on different coils cannot make one continuous piece.
Can I enter an existing remnant?
Enter a measured compatible remnant. The calculator uses it first when an early-coil grouping still permits all runs to fit. A zero length represents no remnant.
When does the setup reserve apply?
Each used coil loses the entered start amount, and each run separately takes its entered trim. An unused remnant retains its whole length.
What costs go in the fixed quote?
Include the fixed amount for the same scope once. Add any remnant charge or included project labor there when it belongs in the quote.
Does the result select a gutter profile?
Use the same verified profile and finish for both sets of compatible coils and make profiles a separate decision.
Similar Calculators
Gutter Repair Cost Calculator & Replacement Threshold
Compare a measured gutter repair quote and a full replacement bid. Find the number of additional repairs that makes replacement less expensive.
Gutter Installation Cost & Fall Planner
Compare gutter installation estimates, section and hanger quantities, and single or split fall profiles with exact drop headroom, cost breakdowns and CSV.
Gutter Sizing & Rainfall Capacity Calculator
Compare gutter and downpipe ratings against roof rainfall demand, outlet layout and available fall. Explore capacity headroom, product alternatives, rainfall plots and CSV.
Steel Coil Weight & Slit Yield Calculator
Estimate steel coil mass and strip length from measured diameters. Check exact slit-lane widths, edge trim, spare width and material yield.
