PTO Accrual Calculator
See your leave balance before you book. Enter your credit schedule, policy limits and planned time off to find projected shortfalls and compare the same period without future leave.
See your leave balance before you book.
Plan dates, compare a year-end rollover, and trace every hour. Start with an illustrative example, then enter your own policy.
Projected ending balance 0 hours. No projected shortfall.
Projection & opening balance
Use the balance before any events on your start date.
YYYY-MM-DD
Inclusive; at most 731 calendar days.
May be negative. An opening balance above the cap is preserved.
How you earn leave
Enter the actual credit schedule from your policy.
May be before the projection. Recurrence stays anchored to this date.
Annual reset always happens first. Match the ordering in your policy.
Caps & annual rollover
These are separate rules. Enable only the limits in your policy.
1–12
February 29 clamps to 28.
Stops future accrual until there is room. Does not erase an existing balance.
Actual credits in the current cycle. Enter zero if the projection starts on reset day.
Excess positive hours are removed at reset. Negative balances are carried forward.
Your balance, one date at a time
Solid: planned leave. Dashed: no leave, recalculated under the same caps. Vertical steps include changes within the day.
- Opening
- 24 h
- Lowest within day
- 24 h
- Closing
- 24 h
- Opening balance24 h → 24 h
Values are displayed to up to seven significant digits. The CSV retains exact fractional hours. Days are an equivalence at your entered hours per day, not a work calendar.
How your requests affect the balance
November break
4 charged dates · 32 h
- Balance before first charge
- 32 h
- Lowest balance after a charge
- 0 h
Excluded: 0 non-working weekdays; 1 listed dates.
All charges fit the projected balance at the time applied.
January half days
5 charged dates · 20 h
- Balance before first charge
- 16 h
- Lowest balance after a charge
- 0 h
Excluded: 0 non-working weekdays; 0 listed dates.
All charges fit the projected balance at the time applied.
Every entered request is applied in full. A projected balance does not decide whether borrowing or leave is permitted.
What changes when you take leave
The no-leave scenario is recalculated, including caps and rollover.
| Hours or equivalent days | Planned | No leave |
|---|---|---|
| Scheduled accrual | 28 h | 28 h |
| Actually credited | 28 h | 16 h |
| Blocked by cycle limit | 0 h | 0 h |
| Blocked by balance cap | 0 h | 12 h |
| Leave charged | 52 h | 0 h |
| Lost at rollover | 0 h | 8 h |
| Ending balance | 0 h | 32 h |
Additional accrual credited
12 h
Rollover loss avoided
8 h
These differences compare your two projections. They are not an optimization or a recommendation to schedule leave on a particular date.
View complete event ledger (18 planned events)
Complete event ledger
Credits blocked by a cap were never added. Rollover loss removes hours already in the balance.
| Date / event | Before | Scheduled | Credited | Cycle blocked | Balance blocked | Leave | Rollover loss | After |
|---|---|---|---|---|---|---|---|---|
| Nov 1, 2026Opening balance | 24 h | 0 h | 0 h | 0 h | 0 h | 0 h | 0 h | 24 h |
| Nov 6, 2026Scheduled credit | 24 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 28 h |
| Nov 20, 2026Scheduled credit | 28 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 32 h |
| Nov 23, 2026November break | 32 h | 0 h | 0 h | 0 h | 0 h | 8 h | 0 h | 24 h |
| Nov 24, 2026November break | 24 h | 0 h | 0 h | 0 h | 0 h | 8 h | 0 h | 16 h |
| Nov 25, 2026November break | 16 h | 0 h | 0 h | 0 h | 0 h | 8 h | 0 h | 8 h |
| Nov 27, 2026November break | 8 h | 0 h | 0 h | 0 h | 0 h | 8 h | 0 h | 0 h |
| Dec 4, 2026Scheduled credit | 0 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 4 h |
| Dec 18, 2026Scheduled credit | 4 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 8 h |
| Jan 1, 2027Annual cycle reset | 8 h | 0 h | 0 h | 0 h | 0 h | 0 h | 0 h | 8 h |
| Jan 1, 2027Scheduled credit | 8 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 12 h |
| Jan 15, 2027Scheduled credit | 12 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 16 h |
| Jan 25, 2027January half days | 16 h | 0 h | 0 h | 0 h | 0 h | 4 h | 0 h | 12 h |
| Jan 26, 2027January half days | 12 h | 0 h | 0 h | 0 h | 0 h | 4 h | 0 h | 8 h |
| Jan 27, 2027January half days | 8 h | 0 h | 0 h | 0 h | 0 h | 4 h | 0 h | 4 h |
| Jan 28, 2027January half days | 4 h | 0 h | 0 h | 0 h | 0 h | 4 h | 0 h | 0 h |
| Jan 29, 2027Scheduled credit | 0 h | 4 h | 4 h | 0 h | 0 h | 0 h | 0 h | 4 h |
| Jan 29, 2027January half days | 4 h | 0 h | 0 h | 0 h | 0 h | 4 h | 0 h | 0 h |
The export also includes exact fractions, annual-cycle counters, eligible work, daily minima and all entered assumptions.
Plan your time off
Each range charges only your selected workdays, excluding the dates you list below.
Holidays & excluded dates
Enter only dates you want excluded from leave charges. No holidays are assumed.
Keep an auditable copy
The CSV includes your policy, both event ledgers, daily balances and request outcomes.
How this projection works
Opening balance precedes all start-date events. Each reset applies your positive carryover limit and clears the cycle counter. Credits are checked against the cycle limit, then the balance cap. Leave is charged in full, in your selected same-day order. Blocked accrual is not saved for later.
Policy concepts: Square’s accrual methods, Justworks’ cap distinctions. The ordering above is this planner’s explicit convention. It does not determine legal entitlements, paid holidays, employer approval, tenure increases or payroll rounding.
How to use this calculator
- Set the projection start and end dates and the opening balance. The opening balance is immediately before all events on the start date; events on the end date are included. Dates have no time zone or automatic holiday adjustment.
- Choose fixed or work-based credits, the first credit date and the credit frequency. Fixed mode posts the entered hours each time. Work mode uses eligible hours and work hours required per PTO hour; enter dated overrides when a credit period has different eligible work.
- Set any balance cap, cycle earning limit and carryover limit separately. Enter the reset month/day and already-credited cycle hours where applicable. Choose the same-day credit/leave order. These are your policy assumptions, not recommended limits.
- Choose working weekdays and enter any excluded holiday dates. Add each leave request with inclusive dates and hours per charged day. A request covering only excluded dates has no charge; overlapping chargeable dates must be repaired.
- Inspect the planned and no-leave balance paths, request outcomes and the first shortfall. Check within-day minima when leave and a credit share a date. A later credit may repair a deficit without making that earlier shortfall disappear.
- Review the complete ledger and download the CSV, or use its selectable text. The report contains the entered assumptions, exact hours and both scenario ledgers. Displaying equivalent days does not change the hours used for credits or leave.
The Formula
The mathematical logic powering this calculation is:
Fixed credit = entered PTO hours on each scheduled date. Work-based credit = eligible work hours ÷ work hours required for one PTO hour. A dated override replaces the default eligible hours for that credit. Credits do not accrue continuously between posting dates.
At an annual reset, carryover loss = max(balance − carryover limit, 0) when that limit is enabled; then the accepted-credit cycle counter resets. Negative balances survive. Reset executes before other events on that date.
For scheduled credit R, first apply the remaining cycle earning limit, then the available balance-cap room. Credited + cycle-blocked + balance-blocked = R. Only credited hours increase the cycle counter. A balance above its cap is retained; the cap limits new credits rather than removing the opening balance.
Planned balance = opening balance + credited hours − charged leave − carryover loss. Leave is charged only on selected working weekdays that are not entered holidays. Credits-before-leave or leave-before-credits is an explicit same-day convention. Every charged request is applied in full, so negative balances remain visible.
The no-leave path is calculated again with the same earnings and caps. Additional credit = planned credited − no-leave credited; avoided carryover loss = no-leave loss − planned loss. These are signed comparisons. Hours are calculated as exact rational quantities; days are a display equivalence using your entered hours per day. The calculation does not determine leave entitlement, employer approval or policy legality.Worked Example
If you input:
- Projection start / end: 2026-11-01 to 2027-01-31
- Opening balance: 24 hours
- Credit schedule: 4 hours every two weeks, first credit 2026-11-06
- Policy limits: 32-hour balance cap; 104-hour cycle limit with 88 already credited; 24-hour carryover limit; reset January 1
- Same-day order: Credits before leave
- Working weekdays: Monday–Friday
- Entered holiday: 2026-11-26
- November break: 2026-11-23 to 2026-11-27, 8 hours per charged day
- January half days: 2027-01-25 to 2027-01-29, 4 hours per charged day
Result:
The seven scheduled credits add 28 hours. The November request uses 32 hours because the entered November 26 holiday is excluded; January's five half days use another 20 hours. With 24 opening hours, the planned balance ends at 0 hours without a shortfall or carryover loss. Recalculating without future leave credits only 16 hours, blocks 12 at the balance cap, loses 8 at the January reset and ends at 32 hours. The planned leave therefore makes room for 12 additional credited hours and avoids 8 hours of rollover loss. These are illustrative entered limits, not employer or legal defaults.
Frequently Asked Questions
How does fixed accrual differ from accrual based on hours worked?
Fixed mode credits the same entered PTO hours on each scheduled date. Work mode divides eligible hours by the work hours required for one PTO hour, using a dated replacement when you enter an override. Eligible work is an assumption you supply; the tool does not infer it from leave requests, overtime pay or holidays. An annual fixed schedule can represent an upfront grant.
What is the difference between a balance cap, cycle limit and carryover limit?
A balance cap restricts new credits when the amount held reaches the cap. A cycle earning limit restricts total accepted credits within the current cycle. A carryover limit removes a positive excess only on the entered annual reset date. Blocked future credits and forfeited existing hours are separate ledger quantities. Spending leave may create room under the balance cap, but does not undo the cycle's already accepted credits.
What happens when a credit, leave request and reset share a date?
The reset always happens first. The selected order then applies credits before leave or leave before credits. This is a declared model convention, not a universal payroll rule. Opening balance is before start-date events. If the start date is also a reset, a nonzero already-credited cycle amount is invalid instead of being silently discarded. Within-day shortfalls remain visible even when the closing balance recovers.
How do month ends, leap days and holidays affect credit dates?
Weekly and biweekly schedules keep 7- and 14-day intervals. Monthly schedules retain their original day or explicit month-end; short months clamp the date without causing later drift. Semimonthly schedules use two entered monthly days. A February 29 annual anchor uses February 28 in nonleap years. Credits are not prorated or moved for weekends and holidays. Entered holidays affect leave charging only.
Does a negative balance mean I can borrow leave?
No. Every chargeable planned request is subtracted in full so you can see a funding shortfall. A negative balance is a projection, not permission to borrow, and a positive balance is not approval to take leave. The tool does not evaluate employment eligibility, legal entitlements, policy validity, payout or employer decisions.
Why is the no-leave ending balance not just my ending balance plus leave used?
Taking leave can create room for credits that would otherwise be blocked by the balance cap, or reduce hours lost at rollover. The no-leave path therefore runs the same schedule and limits again with future leave removed. Its credits and carryover loss can differ. The comparison reports those differences separately rather than treating all requested leave as a simple adjustment.
What scope and input limits apply?
This is one leave account across at most 731 inclusive dates in years 1900–2200, with up to 24 leave requests, 60 entered holidays and 120 work-hour overrides. Leave requests must be inside the horizon; chargeable dates cannot overlap. Numeric drafts support ordinary decimals with up to six fractional places. Inactive numeric drafts remain stored, but active errors must be repaired. There are no automatic tenure changes, expired-credit buckets, payroll rounding or live holiday calendars.
Does switching the display to days change the calculation?
No. Entered quantities and exact arithmetic remain in hours. Days use the hours-per-day equivalence you enter, which need not equal a leave request's hours per charged day. Daily, request and export quantities describe the same hour-based calculation. The display choice does not create a work schedule or change which weekdays are charged.
Similar Calculators
Time Tracking Calculator
Track total worked time across multiple shifts and break periods with dynamic start and end inputs.
Clock Out Time Calculator
Find when to clock out from your start time, target hours, earlier credited work and unpaid breaks. Plan split shifts and overnight finishes with a timeline and CSV.
Date Difference Calculator
Calculate the exact number of days, weeks, months, and years between two dates.
