Project Payback & Cash Recovery Planner

Enter two projects’ net cash events on a common timeline. Follow actual event boundaries to see when each project first recovers its outlay, whether later costs undo that recovery, and what peak cash funding the entered schedule requires.

Dated project cash flow

Compare first and sustained project payback

Recovery and funding comparison

Project A sustains discounted recovery through the entered horizon.

Project A

Discounted balance at horizon

$43.35

Nominal first recovery
2027-01-01 · Day 365
Nominal sustained recovery
2028-01-01 · Day 730
Discounted first recovery
2028-01-01 · Day 730
Discounted sustained recovery
2028-01-01 · Day 730
Nominal balance at horizon
$150.00
Peak nominal funding
$1,000.00
Largest nominal drawdown
$1,000.00

Returns below zero after recovery · 1 nominal and 0 discounted.

Project B

Discounted balance at horizon

−$14.77

Nominal first recovery
2027-03-01 · Day 424
Nominal sustained recovery
2027-03-01 · Day 424
Discounted first recovery
2027-03-01 · Day 424
Discounted sustained recovery
Unreached
Nominal balance at horizon
$70.00
Peak nominal funding
$900.00
Largest nominal drawdown
$900.00

Returns below zero after recovery · 0 nominal and 1 discounted.

Recovery by event date

Nominal cash in USD · −$1,000.00 to $150.00. Open circles mark first recovery and squares mark sustained recovery.

2026-01-012028-01-01

  • Project A
  • Project B

Shared dates and discount

Same-day amounts are netted before discounting. The same timespan and annual effective rate apply to both alternatives.

Enter project cash flows

Enter initial outlay as a positive amount. Enter later inflows as positive and outflows as negative. Start-date and end-date cash flows are included.

Project A event 1
Project A event 2
Project A event 3
Project A event 4
Open grouped cash ledger
Grouped nominal and discounted cash by event date
Project and dateElapsed daysGroup cashGroup present valueCumulative nominalCumulative discounted
Project A · 2026-01-010−$1,000.00−$1,000.00−$1,000.00−$1,000.00
Project A · 2026-07-01181$550.00$524.61−$450.00−$475.39
Project A · 2027-01-01365$500.00$454.55$50.00−$20.84
Project A · 2027-04-01455−$300.00−$266.39−$250.00−$287.23
Project A · 2028-01-01730$400.00$330.58$150.00$43.35
Project B · 2026-01-010−$900.00−$900.00−$900.00−$900.00
Project B · 2026-11-01304$400.00$369.47−$500.00−$530.53
Project B · 2027-03-01424$650.00$581.88$150.00$51.35
Project B · 2028-01-01730−$80.00−$66.12$70.00−$14.77
  • Project A · Peak funding date 2026-01-01 · Largest drawdown date 2026-01-01
  • Project B · Peak funding date 2026-01-01 · Largest drawdown date 2026-01-01

Export the cash comparison

Download project payback CSV
View CSV text

How to use this calculator

  1. Set a common start, inclusive horizon and effective annual discount rate.
  2. Enter each project’s initial outlay and dated signed cash amounts. Use the same currency and accounting basis for both alternatives.
  3. Compare first and sustained dates and check peak funding. Toggle the chart between nominal and discounted balances.
  4. Open the grouped ledger to compare cash and separately rounded present values. Download the working comparison as CSV.

The Formula

The mathematical logic powering this calculation is:

Enter a positive initial outlay for each project on the common start date. Use signed amounts for each dated cash flow. A positive amount is money received and a negative amount is money paid. Net all amounts on the same calendar date, including initial outlay and any other start-date amounts. Cash flows occur on their entered dates, with no within-day or between-date interpolation. Use the same complete date horizon and consistent USD basis for both projects.

The nominal balance is the cumulative sum of net dated amounts. For the discounted balance, multiply the day's net amount by (1 + r)^(−d/365), where r is the entered annual effective rate as a decimal and d is elapsed calendar days from the start. Use 365 as a fixed denominator even in leap years. Round the present value of the net cash on each date once to cents, with exact half cents rounding away from zero. Sum those rounded amounts. This declared accounting convention can differ by cents from an unrounded present-value calculation. At zero discount the two balances are exactly equal. A negative discount rate increases the absolute present value of later cash amounts.

For either balance, first recovery is the earliest date with a nonnegative grouped closing balance. Sustained recovery is the first date from which the balance stays nonnegative through every later event and the entered horizon. If the last event remains negative, sustained recovery is unreached. At an exact zero balance, the date counts. Later outflows can cause the balance to fall below zero again. The chart displays a level beyond the last event until the end date, so the horizon is not interpreted as another cash flow.

Peak nominal funding equals the greatest nominal shortfall below zero, with a floor of zero. Largest nominal drawdown is the greatest drop from a prior nominal balance peak, including the zero point before project cash moves. A later decline from a positive balance can cause a large drawdown with a smaller funding shortfall. Both figures reflect how the entered dates are grouped, without estimating intraday funding.

Use a horizon of up to 3,660 calendar days, years 1900–2200, and up to twelve additional signed cash flows per project. Amounts accept up to $10 million each and two decimals. The annual effective discount rate accepts −50% to 100% with up to four decimals. Enter any applicable taxes, working capital changes, financing cash or terminal costs yourself on a consistent basis. The worksheet does not infer rates, select investments or forecast events beyond the horizon.

Worked Example

If you input:

  • Dates and discount: 2026-01-01 through 2028-01-01 and 10% effective annual discount.
  • Project A: $1,000 initial outlay, then $550 on 2026-07-01, $500 on 2027-01-01, −$300 on 2027-04-01 and $400 on 2028-01-01.
  • Project B: $900 initial outlay, then $400 on 2026-11-01, $650 on 2027-03-01 and −$80 on 2028-01-01.

Result:

A first recovers nominally on 2027-01-01, falls below zero after the later expense and sustains recovery on 2028-01-01. Its discounted recovery occurs on 2028-01-01 and its final discounted balance is $43.35. B first recovers in both views on 2027-03-01, then ends with a −$14.77 discounted balance and no sustained discounted recovery.

Frequently Asked Questions

Why can first and sustained payback give different dates?

A project may reach zero, then later pay a large cost and go below zero. Sustained recovery begins at the first entered date after which every remaining balance through the horizon is nonnegative.

Can I use estimated savings instead of recorded receipts?

Use dated amounts you enter under a consistent project basis. Expected savings can be modeled as a positive cash difference, with the result conditional on those assumptions.

Is there a payback date between entered cash events?

The worksheet only reports recovery after an entered net date. To represent cash spread over several days, enter those scheduled dates separately.

Why can the discounted result differ from an unrounded spreadsheet calculation?

This worksheet rounds the present value of each grouped date to cents before adding it. The stated per-date rounding convention makes the payback and ledger auditable.

What is the difference between funding and drawdown?

Funding measures the deepest balance below zero. Drawdown measures the largest drop from any earlier nominal peak, including before the project starts.

How does payback differ from IRR?

Payback finds a recovery date under your entered schedule and rate. IRR solves for a rate that brings total net present value to zero under its own timing assumptions.

Similar Calculators