Futures Settlement & Collateral Path Calculator
Two fixed futures positions can finish at the same price and still need different opening cash along the way. Enter signed changes from one settlement to the next for two hypothetical paths. Use the same position and scheduled cash transfers in both, and inspect the closing collateral and headroom at each step.
Compare two futures settlement paths
Follow the same position’s cash at each entered closing requirement.
Session label, signed ticks for A, signed ticks for B, shared transfer, closing minimum. Money in USD.
Only path A meets every entered closing minimum.
Compare closing headroom by session
Left of zero is a shortage. Right of zero is collateral above the entered minimum.
Session 1
$800.00 closing minimum
Path A $0.00Path B $250.00Session 2
$950.00 closing minimum
Path A $100.00Path B −$150.00Session 3
$800.00 closing minimum
Path A $500.00Path B $500.00
Review the settlement ledger and exact CSV
Path A cash ledger
Every closing minimum met.
Sets opening requirement: Session 1.
Ending collateral $1,300.00.
Session 1
-20 ticks · −$500.00 settlement · $0.00 transfer
$800.00 closing collateral
Session 2
10 ticks · $250.00 settlement · $0.00 transfer
$1,050.00 closing collateral
Session 3
10 ticks · $250.00 settlement · $0.00 transfer
$1,300.00 closing collateral
Path B cash ledger
First shortage at Session 2.
Sets opening requirement: Session 2.
Ending collateral $1,300.00.
Session 1
-10 ticks · −$250.00 settlement · $0.00 transfer
$1,050.00 closing collateral
Session 2
-10 ticks · −$250.00 settlement · $0.00 transfer
$800.00 closing collateral
Session 3
20 ticks · $500.00 settlement · $0.00 transfer
$1,300.00 closing collateral
How to use this calculator
- Choose the position side, enter the whole contract count and verify the contract's fixed dollar value per price tick.
- Enter opening USD collateral before the first modeled settlement.
- For each session enter a label, two signed tick changes, the shared transfer and the whole-position closing minimum.
- Compare minimum opening collateral, the first shortage and the signed headroom chart. Download the exact daily ledger.
The Formula
The mathematical logic powering this calculation is:
Use one unchanged linear futures position and one USD cash ledger. For each day, settlement variation = signed price tick change × USD value per tick per contract × whole contract count × position sign. Use +1 for long and −1 for short. Enter moves from the previous official settlement. Enter transfers as positive for deposits or negative for withdrawals, assumed posted by that day's closing check.
Closing collateral = opening collateral + cumulative settlement variation + cumulative transfers. Headroom = closing collateral minus the entered total closing minimum for the whole position. Equality passes. The first negative headroom identifies the first modeled shortage. Holding every entered move and transfer fixed, the minimum opening amount equals the greater of zero and the largest across all sessions of (closing minimum − cumulative net change). If several rows have the same largest requirement, all are listed. Changes after the first shortage remain visible as hypothetical cash flows on an unchanged position.
Model 1–12 settlement rows, 1–1,000 contracts and a fixed USD tick value from $0.01 to $10,000 per contract. Enter moves through ±100,000 whole ticks per row and cash inputs to the cent up to $10 million each. The model checks only entered closing times, no intraday checks, automatic replenishment, fills, revalued collateral, fees, options or liquidation. Confirm applicable settlement, transfer times and requirements directly from your broker or exchange.Worked Example
If you input:
- Position: Two long contracts, USD 12.50 per tick each
- Opening collateral: USD 1,300
- Path A tick changes: −20, +10, +10
- Path B tick changes: −10, −10, +20
- Minimums and transfers: USD 800, 950, 800 with no shared transfers
Result:
A needs USD 1,300 initially and matches the first requirement. B needs USD 1,450 and is short by USD 150 in the second session. Both end at USD 1,300 on the unchanged modeled position.
Frequently Asked Questions
Should I enter a settlement price or a price change?
Enter each path's whole-tick change from the preceding settlement. A falling price is a negative tick move. The position side controls whether that move adds or reduces collateral.
Can identical ending prices require different starting cash?
Yes. Earlier losses or higher requirements can create a larger intermediate shortfall even if both price paths add to the same total change.
Where do I include a known initial minimum?
Add a first row with zero moves and zero transfer and enter that minimum. Each row checks only the total requirement entered for that point.
What happens after an entered minimum is missed?
The worksheet flags the shortage and continues the same mathematical position for comparison. Contract and broker procedures determine what would happen in an account.
What does minimum opening collateral assume?
It holds the entered transfers, requirements and tick moves fixed. A change in when a transfer arrives or in the size of a position can change the result.
Similar Calculators
Futures Position & Risk Planner
Calculate futures profit and loss across entry fills and price scenarios. Compare tick exposure, fees, slippage, break-even quotes, equity and margin headroom.
Margin Lending Calculator & Maintenance Comparison
Compare two marked values for a long-stock margin loan. Use your broker’s maintenance rates to calculate equity, cushion, shortfall and the collateral threshold.
Payment Payout & Cash Exposure Calculator
Compare when card payments reach the bank and how much cash your business needs while payouts, refunds and disputes move through the processor.
