Crochet Pricing & Stitch Time Calculator

Record seconds per worked stitch for separate parts of a crochet piece. Enter the counts for two versions, compare order cost and margin at your entered unit prices, and check how many pieces fit your available time.

Measured stitch stages and order pricing

Price crochet work from stitch time

Both versions fit. Version B has the higher modeled margin.
Version A price floor per piece
$46.00
2 within the work budget · 65 min per piece before setup
Version B price floor per piece
$64.00
2 within the work budget · 95 min per piece before setup
Work time by crochet task

The dashed marker shows the 205 min available for the order.

Version A

145 min · Fits available time
Order setup
15 min
Worked stitches
110 min
Active finishing
20 min
Margin at entered prices
$18.00

Version B

205 min · Fits available time
Order setup
15 min
Worked stitches
165 min
Active finishing
25 min
Margin at entered prices
$22.00
Order size and work budget
Measured crochet stages
Stage 1
Stage 2
Version A costs and finishing
Version B costs and finishing
Review stitch stages and exact CSV
Measured stitch stages and order cost
StageVersion AVersion B
Body stitches40 min60 min
Border stitches15 min22.5 min
Valued order labor$58.00$82.00
Total modeled order cost$92.00$128.00

How to use this calculator

  1. Count worked stitches by part or type for each version. Time representative work and enter seconds per stitch.
  2. Enter order quantity, work time available, shared setup and fixed cost, and your entered labor valuation.
  3. Enter active finishing, per-piece materials and offered selling price for each version.
  4. Compare time by task, capacity, minimum price and modeled margin. Save the exact ledger.

The Formula

The mathematical logic powering this calculation is:

For each part or stitch type, stitch labor time per piece equals the entered number of actual worked stitches times the measured seconds per stitch. Enter a separate row for any action counted with a separate measured pace. Sum those rows and add per-piece active finishing minutes. Multiply piece time by the order quantity and add active setup minutes once per order. Compare this total with the entered work-minute budget. Equality passes. Capacity is the number of full pieces that fit after setup, capped at 120 in this worksheet. Zero piece time leaves a capacity of 120 when setup fits.
Labor cost equals the exact work hours times the entered hourly valuation, rounded once to the nearest cent with ties up. Add materials per piece times the quantity and separately stated fixed cost once. Divide by the order count and round upward to the next cent for the minimum per-piece price. Modeled margin at the entered price is the order revenue less this total cost.
Use 1–120 whole pieces and one to six stitch rows. Counts are 0–100,000 per row per piece. Measured pace is 0.01–60 seconds per stitch and time entries are 0–10,000 minutes. Use up to two decimals in measured paces and minutes. Dollar entries are 0–1,000 USD with up to two decimals. The worksheet assumes two alternatives for the same order. Enter active working minutes and comparable quoted terms, including known fees in their matching costs. The worksheet does not calculate pattern gauge, infer stitch counts, schedule holidays or passive waiting time, infer selling fees, estimate delivery dates or predict demand.

Worked Example

If you input:

  • Order: Two pieces, 15 min setup, 205 min available
  • Version A: 65 min and $12 materials per piece at $55
  • Version B: 95 min and $18 materials per piece at $75
  • Shared costs: $24 per work hour and $10 fixed once

Result:

A takes 145 minutes with a $46.00 floor and an $18 order margin. B takes exactly 205 minutes with a $64.00 floor and a $22 order margin. One minute less in the work budget leaves only A fitting.

Frequently Asked Questions

Should I count loops, chains or pattern turning actions?

Enter the same work units you timed. Include those operations in measured stitch time or add a separate row when a separate count and pace fits your pattern.

Where do I account for weaving, joining or blocking?

Use active finishing minutes for those tasks when they are measured separately. Keep passive drying or waiting outside active work.

Does a higher price mean a higher modeled margin?

Compare both materials and the total valued work time. A larger version may require more labor and may exceed the available minutes.

Similar Calculators