Funnel Conversion & Stage Target Calculator
Paste comparable counts for the same ordered stages in two cohorts. Compare each step’s conversion and losses alongside the share of each starting cohort still present. Set a target for the candidate, then inspect how many people would need to get through one transition if its observed downstream completion rate held.
Compare two closed conversion funnels
See where each cohort drops off and how many people must pass a step to meet your goal.
One row per step. Enter stage name, baseline count, candidate count.
The candidate meets the completion target.
Share of each cohort remaining
Compare stages on a common 0% to 100% scale.
- VisitBaseline 100.00%Candidate 100.00%
- CartBaseline 60.00%Candidate 55.00%
- CheckoutSelected stepBaseline 30.00%Candidate 40.00%
- PurchaseBaseline 18.00%Candidate 20.00%
Cart → Checkout
The observed survivors meet this threshold.
This comparison holds the candidate’s downstream completion rate and incoming count fixed.
- Candidate entrants
- 550
- Downstream completion rate
- 50.00%
- Required survivors
- 400
- Additional survivors
- 0
Review stage counts and exact CSV
Visit
Baseline
1,000 people
Candidate
1,000 people
Cart
Baseline
600 people
60.00% step conversion · 400 lost
Candidate
550 people
55.00% step conversion · 450 lost
550 candidate survivors needed
Checkout
Baseline
300 people
50.00% step conversion · 300 lost
Candidate
400 people
72.73% step conversion · 150 lost
400 candidate survivors needed
Purchase
Baseline
180 people
60.00% step conversion · 120 lost
Candidate
200 people
50.00% step conversion · 200 lost
200 candidate survivors needed
How to use this calculator
- Choose matching ordered stages and observation windows for both cohorts. Count each person once per step, starting from the same entry definition.
- Paste one row per stage as stage name, baseline count, candidate count. A tab-separated paste also works.
- Enter the percentage of the candidate’s original cohort that should complete the last stage.
- Select a transition and check the required and available counts. Use the stage ledger or exact CSV to compare all transitions.
The Formula
The mathematical logic powering this calculation is:
Enter two to eight ordered stages and between 1 and 1,000,000 people in each starting cohort. Each subsequent count must be a non-increasing whole count for the same cohort. Stage retention is stage count divided by start count. Step conversion is stage count divided by prior count and is undefined when the prior count is zero. Loss is the prior count minus the current count.
Minimum final completions = ceiling(candidate start × target as a fraction). For one transition, hold its observed downstream continuation fixed at candidate completions / candidate survivors through that transition. At the final stage the continuation factor is 1. Required survivors = ceiling(minimum final completions ÷ continuation factor). A required count above the number who entered the transition exceeds its available entrants. With a positive final target, zero continuation after existing survivors cannot reach the target under the same assumption, and continuation is unknown when there were no survivors to observe. At a zero target, zero survivors suffice. Each intervention is calculated separately. The export gives exact ratios and whole counts.Worked Example
If you input:
- Baseline counts: 1,000 visits, 600 carts, 300 checkouts, 180 purchases
- Candidate counts: 1,000 visits, 550 carts, 400 checkouts, 200 purchases
- Initial completion goal: 20.00%
- Selected transition: Cart to checkout
Result:
The candidate completes 200 purchases at 20.00%, versus the baseline’s 180 at 18.00%. A 20.01% goal raises the candidate floor to 201 purchases. At the observed one-half downstream rate, 402 of its 550 carts need to reach checkout, two more than observed.
Frequently Asked Questions
What makes this a closed funnel?
Every participant enters at the first stage, and later counts include only participants who progressed through the preceding stages in order. For example, a checkout count from the same closed cohort includes people who previously entered its cart stage.
Can I compare cohorts with different starting sizes?
Yes. The chart divides each count by its own original cohort size. The table also shows whole counts and step conversion, so you can see both audience retention and operational volume.
Why does a 20.01% goal require 201 completions out of 1,000?
200 completions reach 20.00%. A whole-person threshold rounds up to the first count whose exact share reaches the goal, which is 201.
When can a transition alone meet the target?
With the observed downstream rate held fixed, the required survivors must fit within the people who entered that transition. A zero or unobserved downstream rate needs a different scenario for a positive completion target.
Can I add the improvements across multiple stages?
Each row holds its own observed downstream rate and upstream entrants fixed. Simultaneous changes affect those assumptions. Use the comparison to understand the arithmetic under a one-transition scenario.
Do these results establish that a change caused more conversions?
The counts describe retention for the two submitted cohorts. Other differences such as traffic sources, observation windows, and selection can affect the comparison.
Similar Calculators
ROAS Calculator & Campaign Profit Planner
Compare advertising scenarios with gross and net ROAS, returns, order costs, fees and profit. Visualize break-even budgets and export the full campaign comparison.
Click-Through Rate Calculator & Traffic Mix Comparison
Calculate CTR for two campaigns, compare them at the same traffic mix, and review percentage-point changes, sampling intervals and segment counts.
Confidence Interval for Proportion Calculator
Estimate a confidence interval around a sample proportion such as a survey result or conversion rate.
Holdout Incremental ROAS Calculator
Compare treatment and holdout conversion rates. Calculate lift-based return on ad spend, contribution after spend and the minimum treatment conversions needed.
