Business Overhead Calculator & Allocation Comparison
Enter one period’s fixed overhead budget, variable cost per driver unit, actual overhead expense and actual activity. Compare two allocation bases using the same driver. See how each choice changes the applied rate, fixed overhead absorbed and remaining difference to actual spending.
Compare two allocation bases
See how each rate reconciles applied overhead with the flexible budget and actual expense.
Overhead absorption comparison
The flexible budget is $11,000.00. Actual expense less that budget gives a spending effect of +$2,000.00.
Basis A
+$500.00
Underapplied overhead
- Rate per driver unit
- $5.00
- Capacity effect
- -$1,500.00
Basis B
+$2,000.00
Underapplied overhead
- Rate per driver unit
- $4.40
- Capacity effect
- $0.00
Actual overhead expense$13,000.00
Basis A applied$12,500.00
- Fixed $7,500.00
- Variable $5,000.00
Basis B applied$11,000.00
- Fixed $6,000.00
- Variable $5,000.00
The dark line marks actual expense. The bars show each basis’s applied fixed and variable amounts.
Period costs and activity
Use the same period, cost pool and driver unit throughout, such as one month of machine hours.
Use the fixed portion of one pool for the selected period.
Enter the budgeted variable overhead per unit of the same driver.
Enter the recorded total for the same cost pool and period.
Use the recorded activity. For example, enter machine hours consistently.
Enter a positive denominator for applying the fixed budget.
Enter the second denominator in the same units.
Allocation ledger
Spending effect plus capacity effect equals actual less applied. The export includes the exact rate numerator and denominator in cents per driver unit.
| Measure | Basis A | Basis B |
|---|---|---|
| Fixed budget | $6,000.00 | $6,000.00 |
| Variable applied | $5,000.00 | $5,000.00 |
| Flexible budget | $11,000.00 | $11,000.00 |
| Actual overhead expense | $13,000.00 | $13,000.00 |
| Spending effect | $2,000.00 | $2,000.00 |
| Fixed applied | $7,500.00 | $6,000.00 |
| Total applied | $12,500.00 | $11,000.00 |
| Capacity effect | -$1,500.00 | $0.00 |
| Actual less applied | $500.00 | $2,000.00 |
Show overhead CSV text
How to use this calculator
- Use one overhead pool and period. Enter the fixed budget, variable amount per driver unit and actual overhead expense.
- Enter the recorded activity. Give that activity and both candidate rate bases the same measurement unit and period.
- Compare predetermined rates and absorption. Read the spending effect against the common flexible budget and the capacity effect under each basis.
- Open the Allocation ledger to compare all rows and download the cent amounts and exact rate fractions.
The Formula
The mathematical logic powering this calculation is:
Choose one overhead pool and one reporting period. Use a consistent driver unit for actual activity and both allocation bases, such as machine hours or direct labor hours. The variable rate is the budgeted overhead per driver unit. Enter the fixed budget and total actual expense for that pool and period. Each basis is a separate candidate denominator for allocating the same fixed budget and can represent a different activity assumption.
For either basis, divide fixed budget by its driver units to get the fixed rate, then add the entered variable rate. Apply the fixed rate to recorded activity. Compute the variable amount as variable rate times the same recorded activity. Round each applied component once to cents, with half a cent rounded upward. Add the two components for total overhead applied. Keep the displayed rounded rate separate from this computation.
The flexible budget at recorded activity equals fixed budget plus that variable amount. Spending effect equals actual expense less flexible budget. Capacity effect equals fixed budget less fixed applied, which is also flexible budget less total applied. The two effects sum to actual expense less total applied. A positive total is underapplied overhead. A negative total is overapplied. Capacity effect describes fixed absorption relative to an entered denominator. The model applies normal costing at recorded driver activity. A standard-cost efficiency variance uses additional standards for the activity allowed for actual output.
Use nonnegative USD with up to two decimals and up to $100 million per monetary input. Enter 0–1,000,000 actual units and 1–1,000,000 units for each basis, with up to two decimals. The worksheet uses exact integer inputs, exact rate fractions and cent totals. Treatment of variances in released financial statements, inventory, tax reporting and pricing decisions requires separate analysis.Worked Example
If you input:
- Fixed budget and variable rate: $6,000 and $2 per direct labor hour
- Actual activity and expense: 2,500 hours and $13,000
- Basis A and B: 2,000 and 2,500 hours
Result:
The $6,000 fixed budget plus $5,000 of variable overhead gives an $11,000 flexible budget. Actual expense is $2,000 higher. Basis A’s $5 hourly rate applies $12,500, leaving $500 underapplied. Basis B’s $4.40 rate applies $11,000, leaving $2,000 underapplied. The activity, fixed budget, variable rate and actual expenses use OpenStax’s Connie’s Candy example. Basis B is an added comparison assumption.
Frequently Asked Questions
Why use two allocation bases?
A denominator such as normal activity or practical capacity changes how much fixed overhead each driver unit carries. Holding the rest of the inputs fixed shows exactly what that choice changes.
Can I compare labor hours with machine hours in the same run?
Use one driver and unit consistently across both bases and actual activity. To compare two different driver types, use their corresponding activity and cost-rate inputs in separate runs.
Why does spending effect stay the same for both options?
It compares actual spending with a flexible budget built at recorded activity. Both alternatives use the same fixed budget and variable rate at that activity.
What does overapplied overhead mean?
Applied overhead exceeded the entered actual spending, so actual less applied is negative. Review the cost pool and reporting requirements separately before accounting for the difference.
Why can the shown rate differ by a cent from my hand calculation?
The displayed per-unit rate rounds for readability. Applied components use the unrounded rate inputs and round after multiplying by recorded activity. Exact cents-per-unit fractions are in the export.
What happens with zero recorded activity?
Both paths apply zero overhead. The flexible budget is the fixed budget and all actual overhead remains unabsorbed. The entered positive bases still produce valid rates.
Similar Calculators
Total Manufacturing Cost & Job Variance Calculator
Calculate manufacturing job costs and cost per accepted unit. Compare planned and recorded materials, labor and applied overhead and trace the difference in a waterfall.
Labor Burden Calculator & Employer Cost Planner
Compare the full employer cost of two labor plans. Add wages and benefits, account for paid and productive hours, and find the revenue needed at your target margin.
Profit and Loss Statement Calculator
Compare two profit and loss statements. Reconcile net sales, gross profit, operating income and net earnings, then see how each line changed the result.
Marginal Cost & Production Tier Calculator
Calculate the cost of making one more unit or moving to a new capacity tier. Compare two production quantities after step charges, sales and inventory costs.
Bookkeeping Services Pricing & Quote Calculator
Compare first-year bookkeeping costs for rolling expense tiers and transaction overages. Plot monthly invoices, cleanup and software fees.