Project Staffing Mix & Blended Billing Rate Calculator

Enter billable hours, paid hours, rates and loaded costs for each role in two project teams. Compare weighted billing rates, quoted-fee costs and the maximum paid time a role can use while preserving your margin target.

Project billing

Compare billing rates and project staffing

Only Plan A meets the quoted-fee margin.

Quoted-fee margin target
30%
Plan A blended billing rate
$173.00 per hour
Plan A margin at the fixed fee
32.125%
Plan A rate-card billings
$8,650.00
Plan B blended billing rate
$163.50 per hour
Plan B margin at the fixed fee
29.9625%
Plan B rate-card billings
$8,175.00
Edit the quote, role hours and rates

Use the same scope for both teams. Include each role’s billable hours within its paid hours and copy its loaded cost per paid hour.

Role 1

Plan A

Plan B

Role 2

Plan A

Plan B

Role 3

Plan A

Plan B

Maximum paid hours for the margin target

Check one Plan B role in quarter-hour totals. Its billable commitment and all other costs stay fixed.

Billable commitment
35 hours
Current paid hours
44 hours
Maximum paid hours
43.75 hours
Plan B margin at this limit
30.1563%

Project cost against the fixed fee

The solid marker is the quoted fee. The dotted line marks the most cost your margin target allows.

  • Loaded labor
  • Other costs
  • Margin cost limit
Loaded labor and other project costs compared with the fixed feeThe two bars use the same dollar scale and show each team’s cost. The solid marker is the quote and the dotted marker is its target cost limit.$0$8KPlan APlan B
Quoted fee
$8,000.00
Cost allowed for target margin
$5,600.00
Plan A total project cost
$5,430.00
Plan A fee after modeled costs
$2,570.00
Plan B total project cost
$5,603.00
Plan B fee after modeled costs
$2,397.00

Paid and billable hours by role

Each full bar is paid time. The teal segment is the time that earns billings at the entered rate.

  • Billable time
  • Other paid time
Plan B billable and paid hours for each roleHours for each role use the same scale in both plans. Teal represents billable time. Purple is the rest of the paid time.044 hoursRole 1Role 2Role 3
  • 1. Lead15 hours billable · 18 hours paid$3,450.00 at rate card · $2,070.00 loaded labor
  • 2. Analyst35 hours billable · 44 hours paid$4,725.00 at rate card · $2,728.00 loaded labor
  • 3. Coordinator0 hours billable · 6 hours paid$0.00 at rate card · $240.00 loaded labor
View CSV text

How to use this calculator

  1. Enter a shared fixed fee and margin target. Enter each team’s direct project costs outside its modeled labor.
  2. For each role, enter its billable and paid hours and the hourly selling and loaded cost rates for the same project scope.
  3. Compare blended billing rate, total modeled cost and the exact margin at the quoted fee. Use the charts to see where role hours and costs differ.
  4. Choose a Plan B role to see its maximum paid time in quarter-hour totals while holding its billable work fixed. Review the proposed cost and export the worksheet.

The Formula

The mathematical logic powering this calculation is:

Compare two teams on the same project scope. Each role’s rate-card billings equal its billable hours times its hourly revenue rate. The team’s blended billing rate equals total rate-card billings divided by total billable hours. Use zero billable hours for roles whose paid time has no billings. A blended rate requires positive billable hours.

Each role’s labor cost equals total paid hours times the loaded rate per paid hour. Paid hours include billable hours and any nonbillable hours assigned to the project. Add other direct project costs once. The fixed-fee remainder equals the quoted project fee less total modeled direct costs. Divide by the quote for the margin. The quote is the revenue basis for this margin. Rate-card billings show what role rates produce over the entered work and are calculated separately. A zero fee leaves the margin unavailable. Equality with the target qualifies.

For the selected Plan B role, hold its billable work and all other project costs fixed. The allowed total cost equals quoted fee times one minus the margin target. Subtract all costs except the selected role’s labor. Divide remaining cost room by its loaded hourly cost and round down to a quarter-hour total. The lowest feasible quarter-hour total must cover the role’s entered billable hours. At zero loaded cost, any supported total that covers the billable work qualifies if the remaining project costs meet the target. The maximum supported paid time is 20,000 hours. This calculation keeps the same role and project scope.

Enter 1 to 6 roles, paid and billable time from 0 to 20,000 hours, rates from $0 to $10,000 per hour, other costs and quoted fee up to $10,000,000, and targets from 0% through 100%. Use up to two decimals. Amounts from hours times rates are kept in exact ten-thousandths of a dollar. Targets and the quarter-hour limit use exact integer arithmetic. Use loaded rates from the same costing basis, and include any additional costs if they belong in the quote. Collection timing, taxes and markups require their own treatment.

Worked Example

If you input:

  • Fixed fee and target: $8,000 at a 30% margin target
  • Two staffing mixes: Three roles with 50 billable hours in each plan
  • Plan B analyst: 35 billable hours, 44 paid hours and a $62 loaded rate per paid hour

Result:

Plan A’s $5,430 cost meets the target. Plan B’s $5,603 cost exceeds the maximum by $3. At 43.75 paid analyst hours, total cost falls to $5,587.50 and Plan B meets the target.

Frequently Asked Questions

Why use billable hours for the blended billing rate?

The weighted rate describes dollars per billed hour at the role rates. Multiplying it by total billable hours reproduces the rate-card billings.

Where do nonbillable project hours enter?

Every modeled paid hour incurs its role’s loaded cost. You can assign paid time to a role even with zero billable hours.

How do I use a fixed project fee and role sales rates together?

The fixed fee determines the modeled quote margin. Role rates provide a separate benchmark for what those billable hours would generate.

Can the selected role's limit fall below its ordinary billable hours?

The quarter-hour limit must cover the billable hours entered for that role. If every eligible total exceeds allowable cost, the result reports that no quarter-hour total fits.

Do the rate-card and fixed-fee numbers include overhead?

Include the relevant loaded labor and other project costs in your entries. The quote margin uses the costs you entered.

Similar Calculators